Meeting Name: Municipal Services Committee Agenda status: Final
Meeting date/time: 8/9/2021 4:30 PM Minutes status: Final-revised  
Meeting location: Council Chambers, 6th Floor
Published agenda: Agenda Agenda Published minutes: Minutes Minutes  
Meeting video:  
Attachments: MSC Agenda Packet 8-9-21.pdf
File #Ver.Agenda #NameTypeTitleActionResultAction DetailsVideo
21-1152 1  Report Action ItemMinutes from July 26, 2021recommended for approvalPass Action details Video Video
21-1155 1  Report Action ItemBartell Drive, from Prospect Ave to Pine Street, be reconstructed with asphalt pavement and concrete curb & gutter to a width of 33’ from back of curb to back of curb, which is 4’ narrower than the existing street. Intersection geometry at Charles St, Hickory St, and Riverdale Dr to be modified to reduce the amount of pavement and create more traditional T-intersection layouts. New concrete sidewalk to be constructed along both sides of Bartell within the project limits. Existing parking provisions within the project limits will remain unchanged.recommended for approvalPass Action details Video Video
21-1154 1  Report Action ItemMorrison Street, from Wisconsin Avenue to Glendale Avenue, be reconstructed with asphalt pavement and curb and gutter. The dimensions of the Morrison Street reconstruction project are as follows: Wisconsin Ave - Randall St: New asphalt pavement to be constructed to a width of 33’ from back of curb to back of curb, which is 4’ narrower than the existing street within this portion of the project. Existing on-street parking to remain unchanged within this portion of the project. Randall St - Brewster St: New asphalt pavement to be constructed to a width of 33’ from back of curb to back of curb, which is 2’ narrower than the existing street within this portion of the project. Existing on-street parking to remain unchanged within this portion of the project. Brewster St - Glendale Ave: New asphalt pavement to be constructed to a width of 33’ from back of curb to back of curb, which is the same width as the existing street within this portion of the project. New street to be shifted 1’ to the east within this portion of the project. Existing on-street parking to remain unchangedrecommended for approvalPass Action details Video Video
21-1156 1  Report Action ItemSummit Street, from Prospect Avenue to Fourth Street, be reconstructed with asphalt pavement and concrete curb & gutter to a width of 26’ from back of curb to back of curb, which is 2’ narrower than the existing street. On-street parking would be removed within the project limits along the west side of Summit Street.recommended for approvalPass Action details Video Video
21-1157 1  Report Action ItemRequest from Home Burger for a street occupancy permit to place tables and chairs in the College Avenue beautification strip at 205 W. College Avenue.recommended for approvalPass Action details Video Video
21-0873 1  Report Action ItemR/B-Approve update to Municipal Code Section 4-392 related to electrical work by a home owner.   Action details Video Video
21-0873 1  Report Action ItemR/B-Approve update to Municipal Code Section 4-392 related to electrical work by a home owner.amendedPass Action details Video Video
21-1158 1  Report Action ItemRequest from Grant Thompson Construction, Inc. for a street occupancy permit to place a dumpster in the Roosevelt Street right-of-way at 610 E. Roosevelt Street from August 6, 2021 through October 8, 2021.recommended for approvalPass Action details Video Video
21-1159 1  Report Action ItemDelete Municipal Code Article VII Sections 4-436 through 4-458 related to the Board of Heating Examiners.recommended for approvalPass Action details Video Video
21-1160 1  Report Action ItemRequest from Sara Wouters for a street occupancy permit to place a Pod in the Lawrence Street right-of-way at 1119 W. Lawrence Street from August 1, 2021 through October 31, 2021.recommended for approvalPass Action details Video Video
21-1161 1  Report Action ItemRequest from Hoffman Planning, Design & Construction Inc. for a street occupancy permit to create a construction zone during the demolition and construction of the YMCA Ramp in the Oneida Street, Lawrence Street, Morrison Street and Soldier Square right-of-way from August 26, 2021 through February 18, 2022.recommended for approvalPass Action details Video Video
21-1174 1  Report Action ItemResolution #10-R-21 Scavenging of Solid Waste/RecyclablesreferredPass Action details Video Video
21-1162 1  Report Action ItemStandard Street Design Guidelines.   Action details Video Video
21-1163 1  Report Action ItemInspections Division Permit Summary Comparison Report   Action details Video Video
21-1169 1  Report Action ItemBIRD e-scooter Report   Action details Video Video
21-1057 1  Report Action Item2021 Mid-Year Performance Report.   Action details Video Video