Meeting Name: Municipal Services Committee Agenda status: Final
Meeting date/time: 1/11/2021 4:30 PM Minutes status: Final  
Meeting location: Council Chambers, 6th Floor
Published agenda: Agenda Agenda Published minutes: Minutes Minutes  
Meeting video:  
Attachments: MSC Agenda Packet 1-11-21.pdf
File #Ver.Agenda #NameTypeTitleActionResultAction DetailsVideo
21-0019 1  MinutesMinutes from December 21, 2020approvedPass Action details Video Video
20-1569 1  Report Action ItemOwaissa Street, from Opechee Street to Pacific Street, be reconstructed with concrete pavement and curb & gutter to a width of 24’ 20'from back of curb to back of curb, which is approximately 1’-4’ wider than the existing street. New concrete sidewalk to be constructed along the east side of Owaissa Street from approximately 160’ south of Pacific Street to approximately 500’ south of Pacific Street. Existing parking provisions within the project limits will remain unchanged. Parking be prohibited on both sides of the street.recommended for approvalPass Action details Video Video
21-0022 1  Report Action ItemAppleton Street, from College Avenue to Pacific Street, and Oneida Street, from Pacific Street to Atlantic Street, be reconstructed with concrete pavement and curb and gutter. The dimensions of the Appleton Street/Oneida Street reconstruction project are as follows: College Avenue - Washington Street: New concrete pavement to be constructed to a width of 41’ from back of curb to back of curb, which is the same width as the existing street within this portion of the project. Washington Street - 150’ north of Packard Street: New concrete pavement to be constructed to a width of 45’ from back of curb to back of curb, which is the same width as the existing street within this portion of the project. 150’ north of Packard Street - Pacific Street (End of Appleton St/Beginning of Oneida St): New concrete pavement to be constructed to a width of 35’ from back of curb to back of curb, which is 2’ wider than the existing street within this portion of the project. Pacific Street (End of Appleton St/Beginning of Oneida St) - Atlantic Street: New concrete pavement to be constructed to recommended for approvalPass Action details Video Video
21-0033 1  Report Action ItemRequest to allow driveway access off Haymeadow for Lot 91, Clearwater Creek Subdivision.recommended for approvalPass Action details Video Video
21-0020 1  PresentationInspection Division Permit Summary Comparison Report for December, 2020.   Action details Video Video
21-0021 1  Presentation2021 Sidewalk Poetry Program   Action details Video Video
20-1654 1  Report Action ItemAnnual Crash Overview 2019.   Action details Video Video