20-1457
| 1 | | | Minutes | Common Council Meeting Minutes of October 21, 2020 | approved | Pass |
Action details
|
Video
|
20-1467
| 1 | | | Report Action Item | Proclamations:
- Appleton High Schools DECA Week
- National Runaway Homeless Youth Prevention Month
- Home Care, Palliative Care, & Hospice Services Month | presented | |
Action details
|
Video
|
20-1459
| 1 | | | Report Action Item | COVID-19 Update | presented | |
Action details
|
Video
|
20-1370
| 1 | | | Report Action Item | Public Hearing for Rezoning #8-20 6th Addition to Emerald Valley | | |
Action details
|
Video
|
20-1371
| 1 | | | Report Action Item | Public Hearing for Rezoning #9-20 7th Addition to Emerald Valley | | |
Action details
|
Video
|
20-1426
| 1 | | | Report Action Item | Meade Street, from Pacific Street to Commercial Street, be reconstructed with concrete pavement and curb and gutter. The dimensions of the Meade Street reconstruction project are as follows:
Pacific St - Hancock St: New concrete pavement to be constructed to a width of 33’ from back of curb to back of curb, which is the same width as the existing street within this portion of the project. On-street parking would be restricted along the east side of Meade Street within this portion of the project.
Hancock St - Commercial St: New concrete pavement to be constructed to a width of 43’ from back of curb to back of curb, which is the same width as the existing street within this portion of the project. Existing on-street parking to remain unchanged within this portion of the project. | amended | Pass |
Action details
|
Video
|
20-1426
| 1 | | | Report Action Item | Meade Street, from Pacific Street to Commercial Street, be reconstructed with concrete pavement and curb and gutter. The dimensions of the Meade Street reconstruction project are as follows:
Pacific St - Hancock St: New concrete pavement to be constructed to a width of 33’ from back of curb to back of curb, which is the same width as the existing street within this portion of the project. On-street parking would be restricted along the east side of Meade Street within this portion of the project.
Hancock St - Commercial St: New concrete pavement to be constructed to a width of 43’ from back of curb to back of curb, which is the same width as the existing street within this portion of the project. Existing on-street parking to remain unchanged within this portion of the project. | approved | Pass |
Action details
|
Video
|
20-1430
| 1 | | | Report Action Item | Kimball Alley, from Mason Street to Story Street, be reconstructed with concrete pavement. The dimensions of the Kimball Alley reconstruction project are as follows:
Mason St - Spruce St: New concrete pavement to be constructed to a width of 16’ from edge of pavement to edge of pavement, which is the same width as the existing alley within this portion of the project.
Spruce St - Summit St: New concrete pavement to be constructed to a width of 14’ from edge of pavement to edge of pavement, which is the same width as the existing alley within this portion of the project.
Summit St - Story St: New concrete pavement to be constructed to a width of 20’ from edge of pavement to edge of pavement, which is the same width as the existing alley within this portion of the project. | approved | Pass |
Action details
|
Not available
|
20-1431
| 1 | | | Report Action Item | Kimball Alley, from Walnut Street to Lawrence Street, be reconstructed with concrete pavement to a width of 20’ from edge of pavement to edge of pavement, which is the same width as the existing alley. | approved | Pass |
Action details
|
Not available
|
20-1367
| 1 | | | Report Action Item | "Class A" Liquor and Class "A" Beer License application for Aldi, Inc d/b/a Aldi #86, Julie A Meier, Agent, located at 2702 N Richmond St, contingent upon approval from all departments. | approved | Pass |
Action details
|
Not available
|
20-1441
| 1 | | | Report Action Item | Request to approve the grant from the Wisconsin Elections Commission (WEC) in the amount of $44,974 for additional election costs incurred due to the COVID-19 pandemic | approved | Pass |
Action details
|
Not available
|
20-1442
| 1 | | | Report Action Item | Request to approve the grant from the Center for Tech and Civic Life in the amount of $18,330 for expenses necessary to plan and administer safe and secure elections in the City in 2020 | approved | Pass |
Action details
|
Not available
|
20-1322
| 1 | | | Report Action Item | Request to approve Rezoning #8-20 to rezone the area generally located along the east and west sides of Providence Avenue for the 6th Addition to Emerald Valley (part of Tax Id #31-1-7600-00), as shown on the attached maps, from AG Agricultural District to R-1B Single-Family District | approved | Pass |
Action details
|
Not available
|
20-1324
| 1 | | | Report Action Item | Request to approve Rezoning #9-20 to rezone the area generally located west of Providence Avenue for the 7th Addition to Emerald Valley (part of Tax Id #31-1-7600-00), as shown on the attached maps, from AG Agricultural District to R1-B Single-family District | approved | Pass |
Action details
|
Not available
|
20-1379
| 1 | | | Report Action Item | Request to approve the Sixth and Seventh Additions to Emerald Valley Preliminary Plat as shown on the attached maps and subject to the conditions in the attached staff report | approved | Pass |
Action details
|
Not available
|
20-1380
| 1 | | | Report Action Item | Request to approve the Trail View Estates South Final Plat as shown on the attached maps and subject to the conditions in the attached staff report | approved | Pass |
Action details
|
Not available
|
20-1377
| 1 | | | Report Action Item | Request to award the City of Appleton Wastewater D-Building HVAC Upgrades Phase 1 Project contract to BP Mechanical, Inc in the amount of $93,976 with a contingency of 10% for a project total not to exceed $103,374 | approved | Pass |
Action details
|
Not available
|
20-1428
| 1 | | | Report Action Item | Request to approve the following 2020 Budget amendment:
General Fund - City Clerk
State Grants +$44,974
Postage +$44,974
to record a grant from the WI Elections Commission for additional election costs incurred due to the COVID-19 pandemic (2/3 vote of Council required) | approved | Pass |
Action details
|
Not available
|
20-1429
| 1 | | | Report Action Item | Request to approve the following 2020 Budget amendment:
General Fund - City Clerk
Grants +$18,330
Election Supplies +$18,330
to record a grant from the Center for Tech and Civic Life for additional election costs necessary to provide safe and secure elections (2/3 vote of Council required) | approved | Pass |
Action details
|
Not available
|
20-1432
| 1 | | | Report Action Item | Request to approve Change Order No 1 for contract 36-20 for 2019 AWWTP Electrical Distribution Upgrades Phase 2 project for refeeding and removal of the E-Building's transformers and motor control centers in the amount of $95,800 resulting in a decrease of the contingency from $230,590 to $134,790. No change to the overall contract amount | approved | Pass |
Action details
|
Not available
|
20-1433
| 1 | | | Report Action Item | Request to award the Engineering Contract for the 2020 AWWTP V2-F2 Buildings Road Replacement project to McMahon Associates in the amount of $42,790 plus a 5% contingency for a total not to exceed a project engineering cost of $44,930 | approved | Pass |
Action details
|
Not available
|
20-1454
| 1 | | | Report Action Item | Ordinances 126-20 and 127-20 | approved | Pass |
Action details
|
Video
|
20-1458
| 1 | | | Report Action Item | #16-R-20 Ellen Kort Peace Park Subcommittee Resolution | referred | |
Action details
|
Video
|