Meeting Name: Municipal Services Committee Agenda status: Final
Meeting date/time: 12/7/2020 4:30 PM Minutes status: Final  
Meeting location: Council Chambers, 6th Floor
Published agenda: Agenda Agenda Published minutes: Minutes Minutes  
Meeting video:  
Attachments: MSC Agenda Packet 12-7-20.pdf
File #Ver.Agenda #NameTypeTitleActionResultAction DetailsVideo
20-1573 1  MinutesMinutes from November 23, 2020approvedPass Action details Video Video
20-1567 1  Report Action ItemLawrence Street, from Walnut Street to Elm Street, be reconstructed with concrete pavement and curb & gutter to a width of 41.5’ from back of curb to back of curb, which is 0.5’ wider than the existing street. The reconstructed Lawrence Street will include 10.5’ travel lanes in each direction, 6’ bike lanes along both sides of the street, and on-street parking to be maintained along the north side of the street, within the project limits. Existing on-street parking along the south side, within the project limits, will be eliminated.recommended for approvalPass Action details Video Video
20-1568 1  Report Action ItemOpechee Street, from Leminwah Street to Owaissa Street, be reconstructed with concrete pavement and curb & gutter to a width of 20’ from back of curb to back of curb, which is approximately 1-3’ wider than the existing street. Existing parking provisions within the project limits will remain unchanged.recommended for approvalPass Roll call Video Video
20-1569 1  Report Action ItemOwaissa Street, from Opechee Street to Pacific Street, be reconstructed with concrete pavement and curb & gutter to a width of 24’ 20'from back of curb to back of curb, which is approximately 1’-4’ wider than the existing street. New concrete sidewalk to be constructed along the east side of Owaissa Street from approximately 160’ south of Pacific Street to approximately 500’ south of Pacific Street. Existing parking provisions within the project limits will remain unchanged. Parking be prohibited on both sides of the street.heldPass Action details Video Video
20-1570 1  Report Action Item***CRITICAL TIMING***Award 2021 Contract for Operations, Maintenance and Monitoring at the Closed City of Appleton Landfill to SCS Engineers in an amount not to exceed $97,447.recommended for approvalPass Action details Video Video
20-1571 1  Report Action ItemAward of 2021 Materials Testing Contract (M-21) to OMNNI Associates, Inc. in an amount not to exceed $125,000.recommended for approvalPass Action details Video Video
20-1576 1  Report Action ItemRequest from Gregg VanDinter to have the $50 Weed Administration Fee waived for 2220 E. Newberry Street.recommended for denialPass Action details Video Video
20-1617 1  Report Action ItemApprove Intergovernmental Agreement with the Town of Grand Chute for the reconstruction of Alvin Street in 2021.recommended for approvalPass Action details Video Video
20-1572 1  Report Action ItemInspection Division Permit Summary Comparison Report for November, 2020.   Action details Video Video
20-1577 1  Report Action ItemRequest to over hire-Public Works Professional Engineer (Action Item at Human Resources Committee)   Action details Video Video