20-1425
| 1 | | | Minutes | Minutes from October 12, 2020 | recommended for approval | Pass |
Action details
|
Not available
|
20-1426
| 1 | | | Report Action Item | Meade Street, from Pacific Street to Commercial Street, be reconstructed with concrete pavement and curb and gutter. The dimensions of the Meade Street reconstruction project are as follows:
Pacific St - Hancock St: New concrete pavement to be constructed to a width of 33’ from back of curb to back of curb, which is the same width as the existing street within this portion of the project. On-street parking would be restricted along the east side of Meade Street within this portion of the project.
Hancock St - Commercial St: New concrete pavement to be constructed to a width of 43’ from back of curb to back of curb, which is the same width as the existing street within this portion of the project. Existing on-street parking to remain unchanged within this portion of the project. | recommended for approval | Pass |
Action details
|
Not available
|
20-1430
| 1 | | | Report Action Item | Kimball Alley, from Mason Street to Story Street, be reconstructed with concrete pavement. The dimensions of the Kimball Alley reconstruction project are as follows:
Mason St - Spruce St: New concrete pavement to be constructed to a width of 16’ from edge of pavement to edge of pavement, which is the same width as the existing alley within this portion of the project.
Spruce St - Summit St: New concrete pavement to be constructed to a width of 14’ from edge of pavement to edge of pavement, which is the same width as the existing alley within this portion of the project.
Summit St - Story St: New concrete pavement to be constructed to a width of 20’ from edge of pavement to edge of pavement, which is the same width as the existing alley within this portion of the project. | recommended for approval | Pass |
Action details
|
Not available
|
20-1431
| 1 | | | Report Action Item | Kimball Alley, from Walnut Street to Lawrence Street, be reconstructed with concrete pavement to a width of 20’ from edge of pavement to edge of pavement, which is the same width as the existing alley. | recommended for approval | Pass |
Action details
|
Not available
|