19-0978
| 1 | | | Report Action Item | Minutes from June 24, 2019. | approved | Pass |
Action details
|
Video
|
19-0979
| 1 | | | Report Action Item | Approve Alley Vacation south of College Avenue and west of S. Oneida Street. | recommended for approval | Pass |
Action details
|
Video
|
19-0981
| 1 | | | Report Action Item | Approve W. Water Street Vacation for the southeasterly side of W. Water Street located approximately 500' northeast of Jackman Street. | recommended for approval | Pass |
Action details
|
Video
|
19-0982
| 1 | | | Report Action Item | Approve E. North Island Street Vacation west of S. Vulcan Street. | recommended for approval | Pass |
Action details
|
Video
|
19-0983
| 1 | | | Report Action Item | Request from Boldt to mark a route on the sidewalk from the Fox Cities Exhibition Center to Appleton Beer Factory with chalk shoe prints with the Boldt logo for the September 18, 2019 WHEA Conference. Marked route to be installed no sooner than September 17, 2019 and removed no later than September 20, 2019. | recommended for approval | Pass |
Action details
|
Video
|
19-0984
| 1 | | | Report Action Item | Request from Crescent Lofts-Appleton, LLC for a permanent street occupancy permit to place a ground mounted transformer for Hoersch Home Appliance at the south end of the Alley south of W. Franklin Street. | recommended for approval | Pass |
Action details
|
Video
|
19-0985
| 1 | | | Report Action Item | R/B-Approve proposed changes to Municipal Code Section 19-110 Metered on-street parking and Section 19-111 Metered off-street parking related to red-head meter time limits. | recommended for approval | Pass |
Action details
|
Video
|
19-0986
| 1 | | | Report Action Item | R/B-Approve proposed change of the seven (7) meters on the north side of College Avenue between Appleton Street and Oneida Street from 2-hour meters to 25-minute red head meters. | recommended for approval | Pass |
Action details
|
Video
|
19-0988
| 1 | | | Report Action Item | R/B-Approve proposed "Yellow Meter Loading Zone" for the first three parking stalls on the southside of College Avenue east of Appleton Street similar to the zone of Oneida Street near City Center. | recommended for approval | Pass |
Action details
|
Video
|
19-0989
| 1 | | | Report Action Item | Approve parking restriction changes on Vulcan Street, south of N. Island Street (Follow-up to six month trial period). | recommended for approval | Pass |
Action details
|
Video
|
19-0990
| 1 | | | Report Action Item | Approve parking changes related to the College Avenue/Matthias Street RRFB Installation Project. | recommended for approval | Pass |
Action details
|
Video
|
19-0991
| 1 | | | Report Action Item | Approve parking changes related to the Richmond Street/Winnebago Street RRFB Installation Project. | recommended for approval | Pass |
Action details
|
Video
|
19-0992
| 1 | | | Report Action Item | Approve parking changes related to the Evergreen Drive Urbanization Project (Haymeadow Avenue to west city limits). | recommended for approval | Pass |
Action details
|
Video
|
19-0996
| 1 | | | Report Action Item | Approve Amendment No. 1 to the Collins Engineers, Inc. Contract for the Bridge Inspections to perform additional LRFD loading analysis as requested by WISDOT and to update the Olde Oneida Street Bridge Rehab Report in an amount not to exceed $7,200 (revised contract amount of $37,200) | recommended for approval | Pass |
Action details
|
Video
|
19-0888
| 2 | | | Report Action Item | R-B-Summer Street, from Gillet Street to Richmond Street, be reconstructed with asphalt and concrete pavement and curb and gutter. The dimensions of the Summer Street reconstruction project are as follows:
Gillet Street-295' west of Mason Street: New asphalt pavement and concrete curb 7 gutter to be constructed to a width of 31' from back of curb to back of curb, which is 2' narrower that the existing street within this portion of the project.
285' west of Mason Street- Mason Street: New concrete pavement to be constructed to a width of 33' rom back of curb to back of curb, which is the same width as the existing street within this portion of the project.
Mason Street- 100' west of Richmond Street: New asphalt pavement and concrete curb & gutter to be constructed to a width of 31' from back of curb to back of curb, which is 2' narrower than the existing street within this portion of the project.
100' west of Richmond Street- Richmond Street: New as[halt pavement and concrete curb & gutter to be constructed to a width of 33' fro back of curn to back of curb, which is the same | recommended for approval | Pass |
Action details
|
Video
|
19-1006
| 1 | | | Report Action Item | Resolution #8-R-19 North Clark Street | referred | Pass |
Action details
|
Video
|
19-0987
| 1 | | | Report Action Item | Inspections Division Permit Summary Comparison Report for June, 2019 | | |
Action details
|
Video
|