Meeting Name: Municipal Services Committee Agenda status: Final
Meeting date/time: 7/15/2019 4:30 PM Minutes status: Final  
Meeting location: Council Chambers, 6th Floor
RESCHEDULED FROM 7/8/19
Published agenda: Agenda Agenda Published minutes: Minutes Minutes  
Meeting video:  
Attachments: MSC Agenda Packet 7-15-19.pdf
File #Ver.Agenda #NameTypeTitleActionResultAction DetailsVideo
19-0978 1  Report Action ItemMinutes from June 24, 2019.approvedPass Action details Video Video
19-0979 1  Report Action ItemApprove Alley Vacation south of College Avenue and west of S. Oneida Street.recommended for approvalPass Action details Video Video
19-0981 1  Report Action ItemApprove W. Water Street Vacation for the southeasterly side of W. Water Street located approximately 500' northeast of Jackman Street.recommended for approvalPass Action details Video Video
19-0982 1  Report Action ItemApprove E. North Island Street Vacation west of S. Vulcan Street.recommended for approvalPass Action details Video Video
19-0983 1  Report Action ItemRequest from Boldt to mark a route on the sidewalk from the Fox Cities Exhibition Center to Appleton Beer Factory with chalk shoe prints with the Boldt logo for the September 18, 2019 WHEA Conference. Marked route to be installed no sooner than September 17, 2019 and removed no later than September 20, 2019.recommended for approvalPass Action details Video Video
19-0984 1  Report Action ItemRequest from Crescent Lofts-Appleton, LLC for a permanent street occupancy permit to place a ground mounted transformer for Hoersch Home Appliance at the south end of the Alley south of W. Franklin Street.recommended for approvalPass Action details Video Video
19-0985 1  Report Action ItemR/B-Approve proposed changes to Municipal Code Section 19-110 Metered on-street parking and Section 19-111 Metered off-street parking related to red-head meter time limits.recommended for approvalPass Action details Video Video
19-0986 1  Report Action ItemR/B-Approve proposed change of the seven (7) meters on the north side of College Avenue between Appleton Street and Oneida Street from 2-hour meters to 25-minute red head meters.recommended for approvalPass Action details Video Video
19-0988 1  Report Action ItemR/B-Approve proposed "Yellow Meter Loading Zone" for the first three parking stalls on the southside of College Avenue east of Appleton Street similar to the zone of Oneida Street near City Center.recommended for approvalPass Action details Video Video
19-0989 1  Report Action ItemApprove parking restriction changes on Vulcan Street, south of N. Island Street (Follow-up to six month trial period).recommended for approvalPass Action details Video Video
19-0990 1  Report Action ItemApprove parking changes related to the College Avenue/Matthias Street RRFB Installation Project.recommended for approvalPass Action details Video Video
19-0991 1  Report Action ItemApprove parking changes related to the Richmond Street/Winnebago Street RRFB Installation Project.recommended for approvalPass Action details Video Video
19-0992 1  Report Action ItemApprove parking changes related to the Evergreen Drive Urbanization Project (Haymeadow Avenue to west city limits).recommended for approvalPass Action details Video Video
19-0996 1  Report Action ItemApprove Amendment No. 1 to the Collins Engineers, Inc. Contract for the Bridge Inspections to perform additional LRFD loading analysis as requested by WISDOT and to update the Olde Oneida Street Bridge Rehab Report in an amount not to exceed $7,200 (revised contract amount of $37,200)recommended for approvalPass Action details Video Video
19-0888 2  Report Action ItemR-B-Summer Street, from Gillet Street to Richmond Street, be reconstructed with asphalt and concrete pavement and curb and gutter. The dimensions of the Summer Street reconstruction project are as follows: Gillet Street-295' west of Mason Street: New asphalt pavement and concrete curb 7 gutter to be constructed to a width of 31' from back of curb to back of curb, which is 2' narrower that the existing street within this portion of the project. 285' west of Mason Street- Mason Street: New concrete pavement to be constructed to a width of 33' rom back of curb to back of curb, which is the same width as the existing street within this portion of the project. Mason Street- 100' west of Richmond Street: New asphalt pavement and concrete curb & gutter to be constructed to a width of 31' from back of curb to back of curb, which is 2' narrower than the existing street within this portion of the project. 100' west of Richmond Street- Richmond Street: New as[halt pavement and concrete curb & gutter to be constructed to a width of 33' fro back of curn to back of curb, which is the samerecommended for approvalPass Action details Video Video
19-1006 1  Report Action ItemResolution #8-R-19 North Clark StreetreferredPass Action details Video Video
19-0987 1  Report Action ItemInspections Division Permit Summary Comparison Report for June, 2019   Action details Video Video