17-1841
| 1 | | | Report Action Item | Minutes from November 6, 2017 | approved | Pass |
Action details
|
Video
|
17-1842
| 1 | | | Report Action Item | Alvin Street, from Evergreen Drive to cul-de-sac, be reconstructed with concrete pavement and curb and gutter to a width of 33' from back of curb to back of curb. New 5' sidewalk to be constructed along entire length of project. | recommended for approval | Pass |
Action details
|
Video
|
17-1843
| 1 | | | Report Action Item | Evergreen Drive, from Alvin Street to Haymeadow Avenue, be reconstructed with concrete pavement and curb and gutter to a width of 38' from back of curb to back of curb. In addition:
a, Bike lanes to be incorporated as part of the project.
b. New 5' wide concrete sidewalk to be constructed 3' north of the south right-of-way of Evergreen Drive.
c. New 10' wide concrete sidewalk/trail to be constructed 4' south of the north right-of-way of Evergreen Drive. | recommended for approval | Pass |
Action details
|
Video
|
17-1856
| 1 | | | Report Action Item | Approve permanent street occupancy permit for Blue Sky Contractors to place a dumpster in the alley south of 423 W. College Avenue for the period beginning November 27, 2017 through February 23, 2018 for interior remodeling. | recommended for approval | Pass |
Action details
|
Video
|
17-1860
| 1 | | | Report Action Item | Approve Amendment No. 2 to Patrick Engineering for additional services related to the Oneida Street Bridge over Jones Park for lighting design and additional sewer design. | recommended for approval | Pass |
Action details
|
Video
|
17-1754
| 1 | | | Report Action Item | R/B- Approve Article V of Chapter 7 of the Municipal Code relating to Health in All Policies. | recommended for denial | Pass |
Action details
|
Not available
|
17-1845
| 1 | | | Report Action Item | Parking Utility Condensed Income Statement for October, 2017. | | |
Action details
|
Video
|