Meeting Name: Municipal Services Committee Agenda status: Final
Meeting date/time: 7/24/2017 4:30 PM Minutes status: Final-revised  
Meeting location: Council Chambers, 6th Floor
Published agenda: Agenda Agenda Published minutes: Minutes Minutes  
Meeting video:  
Attachments: MSC Agenda Packet 7-24-17.pdf
File #Ver.Agenda #NameTypeTitleActionResultAction DetailsVideo
17-1099 1  MinutesMinutes from July 10, 2017.approvedPass Action details Video Video
17-1098 1  Report Action ItemAlley south of Franklin Street from Summit Street to Story Street, be reconstructed with concrete pavement to its current width, varying from 13' to 15' from edge of pavement to edge of pavement.recommended for approvalPass Action details Video Video
17-1100 1  Report Action ItemCenter Street from North Street to Atlantic Street, be reconstructed with asphalt pavement and concrete curb & gutter to a width of 31', which is 2' narrower than the existing street. Existing parking proposed to remain unchanged.recommended for approvalPass Action details Video Video
17-1101 1  Report Action ItemRoosevelt Street from Morrison Street to Durkee Street, be reconstructed with asphalt pavement and concrete curb & gutter to its current width of 37 feet. The street to be shifted 2' to the north to save 5 existing street trees along the south side of the street. Existing parking proposed to remain unchanged.recommended for approvalPass Action details Video Video
17-1102 1  Report Action ItemTelulah Avenue from Calumet Street to Marion Street, be reconstructed with concrete pavement to a width of 40.5' from back of curb to back of curb. Project will include two travel lanes (one in each direction), bike lanes along both sides of Telulah Avenue, and a parking lane along the east side of Telulah Avenue. Parking to be prohibited along the west side of Telulah Avenue within the project limits. The west terrace width to be 5' to accommodate the planting of new trees, with the east terrace width to be 4.5'.recommended for approvalPass Action details Video Video
17-1103 1  Report Action ItemRequest from Chad Wilson to have the $50 Weed Administration Fee waived for 1530 E. Calumet Street.recommended for denialPass Action details Video Video
17-1104 1  Report Action ItemApprove installation of one street light on Providence Avenue, north of Lightning Drive, at an installation cost of $3,187.94.recommended for approvalPass Action details Video Video
17-1105 1  Report Action ItemApprove Inter-Governmental Agreement with Outagamie County for traffic signal installation and associated improvements at the Northland Avenue (CTH OO)/Conkey Street intersection.recommended for approvalPass Action details Video Video
17-1106 1  Report Action ItemRequest from Tundraland to place a mobile showroom in the street right-of-way during Mile of Music, August 3-August 6, 2017.recommended for approvalPass Action details Video Video
17-1121 1  Report Action ItemApprove Amendment No. 1 to the Collins Engineers, Inc. Contract for the Bridge Rehabilitation Reports to perform additional LRFD loading analysis as requested by WISDOT and to update the South Island Street Bridge Rehab Report in an amount not to exceed $7,600 (revised contract amount of $33,696.81)recommended for approvalPass Action details Video Video
17-1107 1  Report Action ItemProposed modification to the Department of Public Works Table of Organization-Engineering Division.   Action details Video Video
17-1108 1  Report Action ItemParking Utility Condensed Income Statement for June, 2017.   Action details Video Video
17-1109 1  Report Action ItemValley Road bike lanes and other street modifications from west of Memorial Drive to Chain Drive.approved  Action details Video Video