16-1486
| 1 | | | Minutes | Common Council Meeting Minutes of September 7, 2016 | approved | Pass |
Action details
|
Video
|
16-1485
| 1 | | | Presentation | Presentation of J.J. Keller Family Foundation Day Proclamation | presented | |
Action details
|
Video
|
16-1484
| 1 | | | Presentation | Presentation by Fox Cities Regional Partnership | presented | |
Action details
|
Video
|
16-1435
| 1 | | | Report Action Item | Resolution Declaring a Change of the District 4 Polling Place to Memorial Presbyterian Church located at 803 E College Ave. | approved | Pass |
Action details
|
Video
|
16-1418
| 1 | | | Report Action Item | Mary Street, from North Street to Pacific Street, be reconstructed with asphalt pavement and concrete curb & gutter to a width of 26’, which is 1’ narrower than the existing street. The curb and gutter along the east west side of Mary Street will be narrowed by 1’, which will save 5 4 existing street trees along the east west side of the street. Parking would be prohibited along the east side of Mary Street within the project limits. | amended | Fail |
Action details
|
Video
|
16-1418
| 1 | | | Report Action Item | Mary Street, from North Street to Pacific Street, be reconstructed with asphalt pavement and concrete curb & gutter to a width of 26’, which is 1’ narrower than the existing street. The curb and gutter along the east west side of Mary Street will be narrowed by 1’, which will save 5 4 existing street trees along the east west side of the street. Parking would be prohibited along the east side of Mary Street within the project limits. | referred | |
Action details
|
Video
|
16-1417
| 1 | | | Report Action Item | * CRITICAL TIMING* Catherine Street, from Washington Street to North Street, be reconstructed with asphalt pavement and concrete curb & gutter to a width of 31’ from back of curb to back of curb, which is 2’ narrower than the existing street. New concrete sidewalk would be constructed along the east side of Catherine Street from Franklin Street to Eldorado Street. Existing parking provisions within the project limits will remain unchanged. | referred | |
Action details
|
Not available
|
16-1377
| 1 | | | Report Action Item | City Program Funding Approval and City Proposals for 2017 CDBG Funding
Here is a link to all of the Project RUSH reports and the Housing Survey from Wilder:
| referred | |
Action details
|
Not available
|
16-1436
| 1 | | | Report Action Item | Operator's License application of Michelle L. Tegen, 1556 E. Moon Beam Trail. | referred | |
Action details
|
Not available
|
16-1467
| 1 | | | Report Action Item | Request to approve the offer to purchase of 210 W. Edgewood Drive in the Town of Grand Chute and authorize the budget adjustment from the Industrial Park Land Fund for the associated acquisition and due diligence costs not to exceed $610,000.00 | approved | Pass |
Action details
|
Video
|
16-1487
| 1 | | | Report Action Item | Request to approve the following 2016 Budget adjustment:
Industrial Park Land Fund
Land +$610,000
Fund Balance - $610,000
to record funds for the purchase of 210 W Edgewood Drive. | approved | Pass |
Action details
|
Video
|
16-1336
| 1 | | | Report Action Item | Request from Brad Engel for a variance to extend the driveway at 1813 N. Charlotte Street 10 feet into the front yard. | approved | Pass |
Action details
|
Not available
|
16-1411
| 1 | | | Report Action Item | Approve City of Appleton Downtown Business Access Assistance Policy. | approved | Pass |
Action details
|
Not available
|
16-1413
| 1 | | | Report Action Item | Lynndale Drive, from Leonard Street to Everett Street, be reconstructed with concrete pavement to a width of 41’ from back of curb to back of curb, which is 8’ narrower than the existing street. New concrete sidewalk would be constructed along both sides of Lynndale Drive within the project limits at all locations where existing sidewalk does not exist. Existing parking provisions within the project limits will remain unchanged. | approved | Pass |
Action details
|
Not available
|
16-1414
| 1 | | | Report Action Item | Lincoln Street, from Olde Oneida Street to approximately 230’ east of Olde Oneida Street, be reconstructed with asphalt pavement and concrete curb & gutter to a width of 37’ from back of curb to back of curb, which is 4’ wider than the existing street. Lincoln Street, from approximately 230’ east of Olde Oneida Street to Madison Street, be reconstructed with asphalt pavement and concrete curb & gutter to a width of 31’ from back of curb to back of curb, which is 2’ narrower than the existing street. Existing parking provisions within the project limits will remain unchanged. | approved | Pass |
Action details
|
Not available
|
16-1415
| 1 | | | Report Action Item | Marquette Street, from Division Street to Oneida Street, be reconstructed with asphalt pavement and concrete curb & gutter to a width of 31’ from back of curb to back of curb, which is 2’ narrower than the existing street. Existing parking provisions within the project limits will remain unchanged. | approved | Pass |
Action details
|
Not available
|
16-1416
| 1 | | | Report Action Item | Summer Street, from Morrison Street to Drew Street, be reconstructed with asphalt pavement and concrete curb & gutter to a width of 35’ from back of curb to back of curb, which is 2’ narrower than the existing street. Summer Street, from Drew Street to Union Street, be reconstructed with asphalt pavement and concrete curb & gutter to a width of 33’ from back of curb to back of curb, which is 4’ narrower than the existing street. Existing parking provisions within the project limits will remain unchanged. | approved | Pass |
Action details
|
Not available
|
16-1419
| 1 | | | Report Action Item | The alley west of Perkins Street, from Charles Street to Perkins Street, be reconstructed with concrete pavement to a width of 20’ from edge of pavement to edge of pavement, which is the same width as the existing alley. Existing parking provisions within the project limits will remain unchanged. | approved | Pass |
Action details
|
Not available
|
16-1420
| 1 | | | Report Action Item | Kamps Avenue, from Fire Station #5 to Douglas Street, be reconstructed with concrete pavement to a width of 29’ from back of curb to back of curb, which is 4’ wider than the existing street. New concrete sidewalk would be constructed along the south side of Kamps Avenue within the project limits. Parking would be prohibited along the south side of Kamps Avenue within the project limits. | approved | Pass |
Action details
|
Not available
|
16-1421
| 1 | | | Report Action Item | Drew Street, from Glendale Avenue to Pershing Street, be reconstructed with asphalt pavement and concrete curb & gutter to a width of 33’ from back of curb to back of curb, which is the same width as the existing street. Curb bumpouts would be constructed at the intersections with Marquette Street, Byrd Street, and Lindbergh Street to improve the pedestrian safety along Drew Street adjacent to Franklin Elementary School. Existing parking provisions within the project limits will remain unchanged. | approved | Pass |
Action details
|
Not available
|
16-1422
| 1 | | | Report Action Item | Sanders Street, from Seymour Street to Verbrick Street, be reconstructed with asphalt pavement and concrete curb & gutter to a width of 31’ from back of curb to back of curb, which is 2’ narrower than the existing street. Existing parking provisions within the project limits will remain unchanged. | approved | Pass |
Action details
|
Not available
|
16-1423
| 1 | | | Report Action Item | Reeve Street, from Linwood Street to Winnebago Street, be reconstructed with asphalt pavement and concrete curb & gutter to a width of 27’ from back of curb to back of curb, which is 1’ narrower than the existing street. The curb and gutter along the north side of Reeve Street will be narrowed by 1’, which will save 7 existing street trees along the north side of the street. Existing parking provisions within the project limits will remain unchanged. | approved | Pass |
Action details
|
Not available
|
16-1424
| 1 | | | Report Action Item | Winnebago Street, from Linwood Street to Badger Avenue, be reconstructed with asphalt pavement and concrete curb & gutter to a width of 33’ from back of curb to back of curb, which is 4’ narrower than the existing street. Existing parking provisions within the project limits will remain unchanged. | approved | Pass |
Action details
|
Not available
|
16-1426
| 1 | | | Report Action Item | Approve Amendment No. 1 to the Collins Engineers, Inc. Contract for the Movable Bridge Inspections to design repairs needed for the trunnion foundation and a girder drainage protection system for the Olde Oneida Street Bridge over the Navigational Canal in an amount not to exceed $7,620 (revised contract amount of $87,620). | approved | Pass |
Action details
|
Not available
|
16-1427
| 1 | | | Report Action Item | Approve No Parking Zone on Harrison Street, east of Oneida Street. | approved | Pass |
Action details
|
Not available
|
16-1428
| 1 | | | Report Action Item | Approve traffic related ordinance changes for the John Street Reconstruction Project from Banta Court to Matthias Street. | approved | Pass |
Action details
|
Not available
|
16-1345
| 1 | | | Report Action Item | "Class A" Beer/Liquor License - Change of Agent of Ultimate Mart LLC, d/b/a Pick 'N Save #8187, Kenneth A. Voss, Agent, 511 W. Calumet St., contingent upon approval from the Police Department. | approved | Pass |
Action details
|
Not available
|
16-1354
| 1 | | | Report Action Item | Class "A" Beer License - Change of Agent of Kwik Trip Inc., Bryan D. Hartjes, Agent, 4085 E. Calumet St., contingent upon approval from the Police Department. | approved | Pass |
Action details
|
Not available
|
16-1355
| 1 | | | Report Action Item | Taxi Cab Company and Limousine Service application of Mo's Taxi Service, Momodou Sanneh, 1524 Schaefer Circle, #6, contingent upon approval from all departments. | approved | Pass |
Action details
|
Not available
|
16-1361
| 1 | | | Report Action Item | "Class B" Beer/Liquor License Change of Premise Description of TNE, Inc. d/b/a Emmetts Bar & Grill, Sharon L. Reader, Agent, 139 N. Richmond St., for events on September 23 & 24, 2016, contingent upon approval from all departments. | approved | Pass |
Action details
|
Not available
|
16-1365
| 1 | | | Report Action Item | Operator's Licenses | approved | Pass |
Action details
|
Not available
|
16-1406
| 1 | | | Report Action Item | Request to Modify the Training Tower Capital Improvement Project | approved | Pass |
Action details
|
Not available
|
16-1434
| 1 | | | Report Action Item | Operator's License application of John W. Moreland, 4 Sherman Place. | approved | Pass |
Action details
|
Not available
|
16-1384
| 1 | | | Report Action Item | Request to approve the dedication of land for public right-of-way for Spartan Drive, Sommers Drive and Haymeadow Avenue as shown on the attached maps | approved | Pass |
Action details
|
Not available
|
16-1385
| 1 | | | Report Action Item | Request to approve the dedication of land for public right-of-way for N. Meade Street and Spartan Drive as shown on the attached maps | approved | Pass |
Action details
|
Not available
|
16-1386
| 1 | | | Report Action Item | **CRITICAL TIMING** Annual review and request to approve the Downtown Appleton Business Improvement District (BID) 2017 Operating Plan | approved | Pass |
Action details
|
Not available
|
16-1324
| 1 | | | Report Action Item | Request to reject awarding Water Garden Redevelopment Project at the Scheig Center in Memorial Park to Solutions 101, Inc. for a contract amount of $164,608.66. | approved | Pass |
Action details
|
Not available
|
16-1401
| 1 | | | Report Action Item | Approve Contract Amendment and Change Order No. 1 to contract 33-16 for Unit X-16 Sewer & Water Reconstruction No.2 for additional stone backfill material required on Glendale Avenue due to extremely unstable soil conditions encountered during construction in the amount of $60,000 resulting in a decrease to contingency from $46,000 to $1,000. Overall contract increased from $1,721,570 to 1,736,570. | approved | Pass |
Action details
|
Not available
|
16-1402
| 1 | | | Report Action Item | Award Unit O-16 Sanitary Sewer and Storm Sewer CIPP Lining to Insituform Technologies USA, LLC in the amount of $121,131.50 with a 10% contingency of $12,000 for a project total not to exceed $133,131.50. | approved | Pass |
Action details
|
Not available
|
16-1403
| 1 | | | Report Action Item | Award Unit Z-16 Sewer and Water Main Reconstruction No. 3 to Carl Bowers & Sons Construction Co, Inc. in the amount of $813,365 with a 4.2% contingency of $34,000 for a project total not to exceed $847,365. | approved | Pass |
Action details
|
Not available
|
16-1404
| 1 | | | Report Action Item | Request to approve revisions to the Procurement Card Policy. | approved | Pass |
Action details
|
Not available
|
16-1407
| 1 | | | Report Action Item | Request to award the contract for the 2016 D-Building Lab Remodel project at the Wastewater Treatment Plant to Cardinal Construction Co, Inc in the amount of $104,765 with a contingency of $5,000 for a contract total not to exceed $109,765, and approve the following 2016 Budget adjustment:
Wastewater Utility Capital Projects
D-Building Lab Remodeling Project +$28,000
Belt Filter Press Electrical Improvement Project - $21,000
Plumbing Improvement Project - $7,000
to transfer positive budget variance from Belt Filter Press and Plumbing projects to the D-Building Lab Remodeling Project. | approved | Pass |
Action details
|
Not available
|
16-1408
| 1 | | | Report Action Item | Request to award contract for the 2016 Parks LED Lighting Upgrade project to Van Ert Electric Company, Inc in the amount of $87,500 with a contingency of $4,000 for a contract total not to exceed $91,500, and approve the following 2016 Budget adjustment:
Facilities Capital Projects
Police Station Deck Repairs Project - $18,000
LED Lighting Upgrade Project +$18,000
to transfer positive budget variance from the Police Station Deck Repairs project to the LED Lighting Upgrade project. | approved | Pass |
Action details
|
Not available
|
16-1409
| 1 | | | Report Action Item | Request to award the contract for 2016 Hardscape Repairs Project to MCC, Inc in the amount of $118,723.72 with a contingency of $3,800 for a project not to exceed $122,523.72. | approved | Pass |
Action details
|
Not available
|
16-1425
| 1 | | | Report Action Item | Request to award contract for the 2016 Wastewater Hardscape Repairs project to MCC, Inc in the amount of $118,030.62 with a contingency of $17,000 for a project not to exceed $135,030.62. | approved | Pass |
Action details
|
Not available
|
16-1430
| 1 | | | Report Action Item | Request to award contract for 2016 Transit Center Roof Repairs project to Northern Metal and Roofing Co, Inc in the amount of $31,545 with a contingency of $5,000 for a project not to exceed $36,545. | approved | Pass |
Action details
|
Not available
|
16-1433
| 1 | | | Report Action Item | Request to approve $1,232,156 advance from the general fund to TIF 6 for 2016 capital costs. | approved | Pass |
Action details
|
Not available
|
16-1312
| 1 | | | Report Action Item | Request to approve the Alexander Company & Iconica Development Agreement for Eagle Point for an approximate 8.1 acre site at 935 E. John Street in Tax Increment Financing District No. 8 | approved | Pass |
Action details
|
Not available
|
16-1392
| 1 | | | Report Action Item | Award Matthias Tower Construction Contract to Maguire Iron, Inc. in the amount of $94,200 with a 10% contingency of $9,420 and a total not to exceed $103,620. | approved | Pass |
Action details
|
Not available
|
16-1389
| 1 | | | Report Action Item | Noise Variance Request - Unit O-16 Sanitary & Storm Sewer | approved | Pass |
Action details
|
Not available
|