Meeting Name: Municipal Services Committee Agenda status: Final
Meeting date/time: 11/10/2015 6:30 PM Minutes status: Final  
Meeting location: Council Chambers, 6th Floor
Published agenda: Agenda Agenda Published minutes: Minutes Minutes  
Meeting video:  
Attachments: MSC Agenda Packet 11-10-2015.pdf
File #Ver.Agenda #NameTypeTitleActionResultAction DetailsVideo
15-1841 1  MinutesMinutes from October 27, 2015approvedPass Action details Video Video
15-1857 1  AppearanceDesign Hearing for the 2017 County Trunk Highway JJ/Edgewood Drive (Ballard Road to 700 feet east of Lightning Drive) Concrete Reconstruction Project   Action details Video Video
15-1859 1  PresentationRequest from Mr. Jherd Hamby, 922 W. Lorain Street, to have his sidewalk snow removal bill of $75 waived.recommended for denialPass Action details Video Video
15-1843 1  Report Action ItemApprove design for the 2018 S. Oneida Street (Skyline Bridge to Valley Road) Concrete Reconstruction Project as follows: - From Valley Road to Murray Street: reconstruct roadway with concrete pavement to a width of 68’ from back of curb to back of curb which would accommodate 2 thru lanes in each direction, a center two way left turn lane, and bike lanes in each direction. In addition, a 6’ wide sidewalk would be constructed tight to the back of curb. This cross section would require approximately 2’ of right of way acquisition from each side. - From Murray Street to Calumet Street: continue the same proposed cross section as stated above including bike lanes, except the two way left turn lane would be a raised concrete median with a left turn lane on to Calumet Street and a left turn lane on to Murray Street. This is similar to the existing cross section. Right of way acquisition in this section would vary from 0 to 2’ on the east side and 3’ to 6’ on the west side. - From Calumet Street to Ramlen Court: continue similar cross section as previous section including bike recommended for approvalPass Action details Video Video
15-1846 1  Report Action ItemApprove proposed parking restriction changes on Lincoln Street in conjuction with the S. Oneida Street Reconstruction Project.recommended for approvalPass Action details Video Video
15-1849 1  Report Action ItemPossible contract scope change for RA Smith, South Oneida Street Design.   Action details Video Video
15-1850 1  PresentationInspection Division Permit Summary Comparison Report for October, 2015.   Action details Video Video