Meeting Name: Municipal Services Committee Agenda status: Final
Meeting date/time: 12/8/2015 6:30 PM Minutes status: Final  
Meeting location: Council Chambers, 6th Floor
Published agenda: Agenda Agenda Published minutes: Minutes Minutes  
Meeting video:  
Attachments: MSC Agenda Packet 12-08-2015.pdf
File #Ver.Agenda #NameTypeTitleActionResultAction DetailsVideo
15-2013 1  MinutesMinutes from November 10, 2016approvedPass Action details Video Video
15-2015 1  Report Action ItemApprove design for Calumet Street portion of the 2018 S. Oneida Street Concrete Reconstruction Project as follows: Calumet Street from 650' west of Oneida Street to Jefferson Street: reconstruct the roadway with concrete pavement to accommodate two thru lanes in each direction, bike lanes in each direction, left turn lanes on to Oneida Street and a right turn lane from eastbound Calumet Street on to southbound Oneida Street. Construct a 6' wide sidewalk tight to the back of curb on both sides.recommended for approvalPass Action details Video Video
15-2021 1  Report Action ItemApprove design for Olde Oneida Street portion of the 2018 S. Oneida Street Concrete Reconstruction Project as follows: Olde Oneida Street from Oneida Street to E. South River Street: reconstruct the roadway with concrete pavement to accommodate one thru lane in each direction, bike lanes in each direction and a right turn lane on to Oneida Street. Construct a 6' wide sidewalk tight to the back of curb on both sides. Construct indented parking along the south side of Olde Oneida Street between Orange Street and Lincoln Street. All other on-street parking would be removed from Olde Oneida Street.recommended for approvalPass Action details Video Video
15-2025 1  Report Action ItemApprove design for Orange Street portion of the 2018 S. Oneida Street Concrete Reconstruction Project as follows: Orange Street from Olde Oneida Street to 200' south: reconstruct the roadway with concrete pavement to a width of 36' from back of curb to back of curb. This is approximately 7' wider than existing. All widening to be done to the west. Construct a 6' wide sidewalk along the east side of the street tight to the back of curb. Allow parking on both sides of the street.recommended for approvalPass Action details Video Video
15-2037 1  Report Action ItemAward 2016 Contract for Operation, Maintenance and Monitoring at the closed City of Appleton Landfill to SCS Engineers in an amount not to exceed $58,390, and authority for contract extensions through 2025.recommended for approvalPass Action details Video Video
15-2043 1  Report Action ItemRequest from Angels Forever for a permanent street occupancy permit to install a 7'10" W x 8' H x 4'6" D buddha that extends into the College Avenue right-of-way 4.5 feet. Guidelines used for administrative approval is maximum projections of 4 feet.recommended for approvalPass Action details Video Video
15-2045 1  Report Action ItemApprove proposed Building Plan Release Policy.recommended for approvalPass Action details Video Video
15-2046 1  Report Action ItemApprove removal of loading zone on Drew Street by First English Lutheran Church (326 E. North Street).recommended for approvalPass Action details Video Video
15-2047 1  Report Action ItemApprove changes to City bus loading zone on the north side of Washington Street west of Oneida Street.recommended for approvalPass Action details Video Video
15-2048 1  Report Action ItemApprove parking restrictions on Banta Court near John Street.recommended for approvalPass Action details Video Video
15-2049 1  Report Action ItemApprove school bus loading zone at 719 W. Ridgeview Drive.recommended for approvalPass Action details Video Video
15-2050 1  Report Action ItemApprove parking restrictions on the west side of Clara Street at Johnston Elementary School.recommended for approvalPass Action details Video Video
15-2051 1  Report Action ItemRecommend to Outagamie County Highway Department to reconstruct CTH JJ from Ballard Road to Lightning Drive as follows: Reconstruct the existing roadway with concrete pavement having the following design components as shown on attached sketch and described below: o Construct a raised concrete median with two left-turn access points to the north. o Provide an enhanced pedestrian crosswalk of Edgewood Drive at the west side of the Appleton North High School (ANHS) entrance. o Construct a single-lane roundabout with east, west, north, and south approaches at the Lightning Drive intersection, with right-of-way sufficient for future roundabout expansion to two lanes, if needed. o Construct one 12-foot eastbound and one 12-foot westbound through lane (plus 2.5-foot curb and gutter) o Construct one 4-foot eastbound and one 4-foot westbound bike lane (plus 2.5-foot curb and gutter) o Construct one 5-foot concrete sidewalk along north right-of-way line and one 10-foot asphalt multi-use trail along south right-of-way line. o Construct a dedicated eastbound right-turn heldPass Action details Video Video
15-2076 1  Report Action Item#17-R-15/Martin RESOLUTION- Public Art in Street right-of-way WHEREAS, Sec. 23-507. Signs in the right-of-way. No signs shall be placed upon any street right-of-way WHEREAS, Public art is something that is created with imagination and skill and that is beautiful or that expresses important ideas or feelings WHEREAS, The city has approved murals, works created by artists: paintings, sculptures, etc. NOW THEREFORE BE IT RESOLVED, The City of Appleton Attorney’s office is directed to prepare a new ordinance that would allow commercial companies and foundations to attach their names to public art. In a way that is not obtrusive or offensive in the street right-of-way.heldPass Action details Video Video
15-2029 1  PresentationInspections Division Permit Summary Comparison Report for November, 2015.   Action details Video Video
15-2031 1  Presentation2015 Great Ideas List   Action details Video Video
15-2032 1  PresentationFuture streetscape element decisions for the S. Oneida Street Reconstruction Project.   Action details Video Video
15-2033 1  PresentationUpdate on County Road AP (Midway Road) Safety Improvement Project.   Action details Video Video
15-2035 1  PresentationWE Energies Re-lamping Project   Action details Video Video