15-1140 1  MinutesMinutes from June 23, 2015.approvedPass Action details Video Video
15-1141 1  Report Action ItemRequest from Memorial Presbyterian Church to appeal their $50.00 Weed Administration Fee for the vacant lot at 802 E. John Street.recommended for denialPass Action details Video Video
15-1143 1  Report Action ItemAward sole source contract with Walker Parking Consultants for professional services related to retrofitting the Green, Yellow and Red Parking Ramps to pay-on-exit design in an amount not to exceed $46,500.recommended for approvalPass Action details Video Video
15-1146 1  Report Action ItemAlley north of Spencer Street (Linwood Ave to Victoria St): The alley north of Spencer Street, from Linwood Avenue to Victoria Street, be reconstructed with concrete pavement to a width of 10’ from edge of pavement to edge of pavement, which is the same width as the existing alley.recommended for approvalPass Action details Video Video
15-1149 1  Report Action ItemAlley north of Spencer Street (Spruce St to Summit St): The alley north of Spencer Street, from Spruce Street to Summit Street, be reconstructed with concrete pavement to a width of 10’ from edge of pavement to edge of pavement, which is the same width as the existing alley.recommended for approvalPass Action details Video Video
15-1150 1  Report Action ItemDivision Street (Franklin St to Atlantic St): Division Street, from Franklin Street to Packard Street, be reconstructed with concrete pavement and curb and gutter to a width of 39’ from back of curb to back of curb, which is 2’ wider than the existing street within this block. Current on-street parking would remain unchanged. Three (3) street trees along the east side of Division Street will be removed due to close proximity to the proposed street and poor condition. Division Street, from Packard Street to Atlantic Street, be reconstructed with concrete pavement and curb and gutter to a width of 34’ from back of curb to back of curb, which is 3’ narrower than the existing street within this block. Division Street, within this block, would be narrowed by 2’ along the west side and 1’ along the east side. On-street parking would be removed along the west side of Division Street between Packard Street to Atlantic Street. Four (4) street trees within this block will be removed due to close proximity to the proposed street and poor condition.recommended for approvalPass Action details Video Video
15-1151 1  Report Action ItemGlendale Ave (Birchwood Ave to Mason St): Glendale Avenue, from Birchwood Ave to Linwood Avenue, be reconstructed with concrete pavement and curb and gutter to a width of 33’ from back of curb to back of curb, which is four (4’) feet narrower than the existing street. Current on-street parking would remain unchanged. Glendale Avenue, from Linwood Avenue to Mason Street, be reconstructed with concrete pavement and curb and gutter to a width of 37’ from back of curb to back of curb, which is the same width as the existing street. Curb bumpouts to improve pedestrian crossings would be constructed at the intersections of Glendale Ave and Nicholas St, Glendale Ave and Outagamie Street, and Glendale Ave and Elinor Street. The north terrace between Gillet Street and Elinor Street, adjacent to Highlands Elementary School, would be reconstructed with concrete sidewalk. Current on-street parking would remain unchanged.recommended for approvalPass Action details Video Video
15-1152 1  Report Action ItemOwaissa Street (Wisconsin Ave to Glendale Ave): Owaissa Street, from Wisconsin Avenue to Glendale Avenue, be reconstructed with concrete pavement and curb and gutter to a width of 33’ from back of curb to back of curb, which is the same width as the existing street. Current on-street parking would remain unchanged.recommended for approvalPass Action details Video Video
15-1153 1  Report Action ItemR/B as Amended-Alderperson Croatt-Bateman Street (Pacific St to Hancock St): Bateman Street, from Pacific Street to Atlantic Street, be reconstructed with asphalt pavement and concrete curb and gutter to a width of 28’ from back of curb to back of curb, which is 1’ narrower than the existing street. Bateman Street, from Pacific Street to Atlantic Street, would be narrowed by 1’ along the east side to save 3 existing street trees. Current on-street parking would be removed from the east side of the street. Bateman Street, from Atlantic Street to Hancock Street, be reconstructed with concrete pavement and curb and gutter to a width of 29’ from back of curb to back of curb, which is the same width as the existing street. On-street parking would be removed from this block of Bateman to improve maneuverability for fire trucks entering and exiting from Fire Station #1.recommended for approvalPass Action details Video Video