18-0975
| 1 | | | Minutes | Minutes from June 11, 2018. | approved | Pass |
Action details
|
Video
|
18-0885
| 1 | | | Report Action Item | Jennifer Stephany from Appleton Downtown Inc. regarding downtown maintenance and upcoming creative projects. | | |
Action details
|
Video
|
18-1009
| 1 | | | Report Action Item | Design Hearing for the following streets in the 2020 pavement reconstruction program:
-Winnebago Street from Division Street to Drew Street
-Randall Street from Oneida Street to Meade Street | | |
Action details
|
Video
|
18-0890
| 1 | | | Report Action Item | Henry Street, from Warner Street to Telulah Avenue, be reconstructed with asphalt pavement and concrete curb & gutter. The dimensions of the Henry Street reconstruction project are as follows:
175’ west of Warner St - Warner St: New asphalt pavement to be constructed to a width of 29’ from back of curb to back of curb, which is the same width as the existing street within this portion of the project.
Warner St - Telulah Ave: New asphalt pavement to be constructed to a width of 33’ from back of curb to back of curb, which is the same width as the existing street within this portion of the project.
New concrete sidewalk would be constructed along the north side of Henry Street from 175’ west of Warner Street to Warner Street, and along the south side of Henry Street from 175’ west of Warner Street to Telulah Avenue. Existing parking provisions within the project limits will remain unchanged except near midblock crosswalk. | held | Pass |
Action details
|
Video
|
18-0891
| 1 | | | Report Action Item | Warner Street, from College Avenue to Henry Street, be reconstructed with asphalt pavement and concrete curb & gutter to a width of 33’ from back of curb to back of curb, which is the same width as the existing street. Existing parking provisions within the project limits will remain unchanged. New concrete sidewalk would be constructed along the west side of Warner Street within the project limits. | held | Pass |
Action details
|
Video
|
18-0788
| 1 | | | Report Action Item | R/B Resolution #7-R-18 Snow Emergencies
Submitted by: William Siebers, District 1
Date: May 16, 2018
Referred to: Municipal Services Committee
Whereas, there are only 218 days left until winter, And
Whereas, the best time to deal with a problem is before circumstances force our hand, And
Whereas, with all winters we will once again need to deal with winter storms, which includes calling snow emergencies, And
Whereas, snow emergencies are exactly that, emergencies, And
Whereas, these emergencies are called to promote the most efficient removal of snow from our streets, and also to promote safety, And
Whereas, as common as it is to have snow storms in the winter it is also common for people to ignore the parking ban during the snow emergency, And
Whereas, the fine for parking on the street during the snow emergency is the same as a normal parking ticket and not likely a deterrent as we would hope,
Therefore, the fine for parking on the street during a snow emergency be more reflective of the seriousness of the situation and be increased to $100. | held | Pass |
Action details
|
Video
|
18-0976
| 1 | | | Report Action Item | Resolution #9-R-18 1700 W. Kamps Avenue Parking.
Submitted by: Cathy Spears, District 12
Date: June 20, 2018
Referred to: Municipal Services Committee
Due to a resident's concern;
The newly reconstructed 1700 W. Kamps Ave,
All parking be removed from both sides of the street | recommended for approval | Pass |
Action details
|
Video
|
18-0977
| 1 | | | Report Action Item | Request from Mile of Music to do the following from August 2, 2018 through August 5, 2018:
*Place table and banners in College Avenue beautification strip adjacent to metered stall #CAW402.
*Place two charging stations (7 feet tall) in College Avenue beautification strip adjacent to metered stall #CAW115.
*Place Tundraland tent in College Avenue beautification strip adjacent to metered stall #CAW303. | recommended for approval | Pass |
Action details
|
Video
|
18-0996
| 1 | | | Report Action Item | Proposed parking restriction changes on Harris St. & Durkee St. by St. Paul's Lutheran Church. (Follow-Up to Six Month Trial Period) | recommended for approval | Pass |
Action details
|
Video
|
18-1004
| 1 | | | Report Action Item | Request for a street occupancy permit to keep a basketball pole in the street right-of-way at 1513 E. Henry Street. | held | Pass |
Action details
|
Video
|
18-1018
| 1 | | | Report Action Item | Approve Amendment No. 4 to Patrick Engineering for the Oneida Street Bridge Project in the amount of $17,560 for a total revised not to exceed contract of $607,841. | recommended for approval | Pass |
Action details
|
Not available
|
18-1017
| 1 | | | Report Action Item | Approve installation of twelve (12) banners on Newberry Street and Riverheath Way. | recommended for approval | Pass |
Action details
|
Video
|
18-0895
| 1 | | | Report Action Item | Proposed refuse cart fee changes for 2019 Budget. | | |
Action details
|
Not available
|
18-0896
| 1 | | | Report Action Item | Proposed Parking Utility rate increases for 2019 Budget. | | |
Action details
|
Video
|
18-0894
| 1 | | | Report Action Item | Inspections Division Permit Summary Comparison Report for May, 2018. | | |
Action details
|
Video
|
18-1005
| 1 | | | Report Action Item | Inspections Division Permit Comparison Report for June, 2018. | | |
Action details
|
Video
|