22-1306
| 1 | | | Minutes | Common Council Meeting Minutes & Common Council Special Session Meeting Minutes of October 5, 2022 | approved | Pass |
Action details
|
Video
|
22-1109
| 1 | | | Report Action Item | Public Hearing for Comprehensive Plan Text Amendment #3-22 for Chapter 14: Downtown Plan, Section 4: Downtown Development Concept, Opportunity Site #7 Soldier's Square/YMCA Parking Ramp | | |
Action details
|
Video
|
22-1247
| 1 | | | Report Action Item | Request to approve Special Use Permit #11-22 for a restaurant with alcohol sales and service and associated outdoor area located at 2821 N. Ballard Road (Tax Id #31-1-6536-00), as shown on the attached materials and per attached plan of operation, to run with the land subject to the conditions in the attached staff report and approve attached Resolution (2/3 vote of Common Council required for approval) | approved | Pass |
Action details
|
Video
|
22-1132
| 1 | | | Report Action Item | Request to approve Comprehensive Plan 2010-2030 Text Amendment #3-22 to amend Chapter 14: Downtown Plan, Section 4: Downtown Development Concept, Opportunity Site #7 Soldier's Square/YMCA Parking Ramp on Pages 314, 318 and 319, as identified in the attached documents and approve attached Resolution | approved | Pass |
Action details
|
Video
|
22-1274
| 1 | | | Report Action Item | Request to approve 2023 Add-on Water Main Replacement Project List. | approved | Pass |
Action details
|
Video
|
22-1280
| 1 | | | Report Action Item | Rankin Street, from 200’ south of Alton Street to College Avenue, be reconstructed with asphalt pavement and curb and gutter. The dimensions of the Rankin Street reconstruction project are as follows:
200’ south of Alton Street - Alton St: New asphalt pavement to be constructed to a width of 25’ from back of curb to back of curb, which is 1’ narrower than the existing street within this portion of the project. Existing on-street parking to remain unchanged within this portion of the project.
Alton St - College Ave: New asphalt pavement to be constructed to a width of 31’ from back of curb to back of curb, which is 2’ narrower than the existing street within this portion of the project. Existing on-street parking to remain unchanged within this portion of the project. | approved | |
Action details
|
Not available
|
22-1292
| 1 | | | Report Action Item | Summit Street, from Packard Street to Elsie Street, be reconstructed with asphalt pavement and concrete curb & gutter to a width of 26’ from back of curb to back of curb, which is 2’ narrower than the existing street. Existing on-street parking would be restricted along the west side of Summit Street, within the project limits. | approved | Pass |
Action details
|
Not available
|
22-1267
| 1 | | | Report Action Item | Cigarette License application for Pillow Talk-N-Wine LLC, Lisa Pitts, Applicant, located at 2310 W College Ave Unit C. | approved | Pass |
Action details
|
Not available
|
22-1133
| 1 | | | Report Action Item | Request to approve the Trail View Estates South 3 Final Plat as shown on the attached maps and subject to the conditions in the attached staff report | approved | Pass |
Action details
|
Not available
|
22-1278
| 1 | | | Report Action Item | Request to reject base bid from Staab Construction in the amount of $643,600 for the 2022 AWWTP Blended Sludge Piping and Preliminary Heat Exchanger Replacement Project. | approved | Pass |
Action details
|
Not available
|
22-1282
| 1 | | | Report Action Item | Request to award the 2022 AWWTP Biogas Boiler System Upgrades Project contract to Rohde Brothers, Inc. in the amount of $333,450 with a 12% contingency of $40,014 for a project total not to exceed $373,464. | approved | Pass |
Action details
|
Not available
|
22-1283
| 1 | | | Report Action Item | Request to award the City of Appleton’s 2022 Telulah Pavilion Repairs Project contract to RJM Construction, LLC. in the amount of $158,572 with a 12% contingency of $19,028 for a project total not to exceed $177,600. | approved | Pass |
Action details
|
Not available
|
22-1284
| 1 | | | Report Action Item | Request to award the City of Appleton’s 2022 AWWTP Painting Project contract to SDS Painting Co., Inc. in the amount of $121,760 with a 8% contingency of $10,000 for a project total not to exceed $131,760. | approved | Pass |
Action details
|
Not available
|
22-1288
| 1 | | | Report Action Item | Request to approve the following 2022 Budget amendment:
Public Works Capital Project Fund -$27,302
Facilities Capital Project Fund +$27,302
To record transfer of sidewalk costs from Public Works Capital Project Fund to Facilities Capital Project Fund. | approved | Pass |
Action details
|
Not available
|
22-1264
| 1 | | | Report Action Item | Request to approve a variance to Section 4.H of the Deed Restrictions and Covenants for the Northeast Business Park Plat No. 3 to allow for an ancillary structure at 2331 E. Evergreen Drive (Tax Id #31-1-6510-41) | approved | Pass |
Action details
|
Not available
|
22-1249
| 1 | | | Report Action Item | Approve changes to Municipal Code Chapter 24, Erosion and Sediment Control. | approved | Pass |
Action details
|
Not available
|
22-1250
| 1 | | | Report Action Item | Approve changes to Erosion and Sediment Control Program. | approved | Pass |
Action details
|
Not available
|
22-1240
| 1 | | | Report Action Item | Request to Approve the Fire Fighter 2023-2025 Contract. | approved | Pass |
Action details
|
Not available
|
22-1241
| 1 | | | Report Action Item | Request to Approve the Fringe Benefit Policy Changes. | approved | Pass |
Action details
|
Not available
|
22-1307
| 1 | | | Report Action Item | Ordinances 57-22 & 58-22 | approved | Pass |
Action details
|
Video
|