20-1261
| 1 | | | Minutes | Common Council Meeting Minutes of September 16, 2020 | approved | Pass |
Action details
|
Video
|
20-1262
| 1 | | | Report Action Item | Public Arts Committee Reappointments | approved | Pass |
Action details
|
Video
|
20-1263
| 1 | | | Report Action Item | Previously Presented Proclamations:
Indigenous Peoples Day
National Coming Out Day
Fire Prevention Week | | |
Action details
|
Video
|
20-1264
| 1 | | | Report Action Item | COVID-19 Update | presented | |
Action details
|
Video
|
20-1154
| 1 | | | Report Action Item | Public Hearing for an Intergovernmental Cooperation Agreement between the City of Appleton and the Town of Buchanan regarding corporate boundaries. | | |
Action details
|
Video
|
20-1205
| 1 | | Memo-Ellen Kort Peace Park Monument | Report Action Item | Action Item: Request Approval of the Conceptual Design - Proposed Sexual Assault Survivors Monument-Placed Within the Future Ellen Kort Peace Park | approved | Pass |
Action details
|
Video
|
20-1219
| 1 | | | Report Action Item | Request to approve Special Use Permit #5-20 for an automobile sales and display lot located at 1314 West College Avenue (Tax Id #31-5-1770-01), as shown on the attached maps and per attached plan of operation, to run with the land subject to the conditions in the attached staff report and approve attached Resolution (2/3 vote of Common Council required for approval) | approved | Pass |
Action details
|
Video
|
20-1228
| 1 | | | Report Action Item | Douglas Street, from Commercial Street to Wisconsin Street, be reconstructed with asphalt pavement and concrete curb & gutter to a width of 31’ from back of curb to back of curb, which is 2’ narrower than the existing street. Existing parking provisions within the project limits will remain unchanged. | amended | Pass |
Action details
|
Video
|
20-1228
| 1 | | | Report Action Item | Douglas Street, from Commercial Street to Wisconsin Street, be reconstructed with asphalt pavement and concrete curb & gutter to a width of 31’ from back of curb to back of curb, which is 2’ narrower than the existing street. Existing parking provisions within the project limits will remain unchanged. | approved | Pass |
Action details
|
Video
|
20-1230
| 1 | | | Report Action Item | Elsie Street, from Mason Street to Richmond Street, be reconstructed with asphalt pavement and concrete curb & gutter to a width of 31’ from back of curb to back of curb, which is 2’ narrower than the existing street. Existing parking provisions within the project limits will remain unchanged. | amended | Pass |
Action details
|
Video
|
20-1230
| 1 | | | Report Action Item | Elsie Street, from Mason Street to Richmond Street, be reconstructed with asphalt pavement and concrete curb & gutter to a width of 31’ from back of curb to back of curb, which is 2’ narrower than the existing street. Existing parking provisions within the project limits will remain unchanged. | approved | Pass |
Action details
|
Video
|
20-1229
| 1 | | | Report Action Item | Atlantic Street, from Oneida Street to Lawe Street, be reconstructed with concrete pavement and curb & gutter to a width of 31’ from back of curb to back of curb, which is 2’ narrower than the existing street. Existing parking provisions within the project limits will remain unchanged. | approved | |
Action details
|
Not available
|
20-1230
| 1 | | | Report Action Item | Elsie Street, from Mason Street to Richmond Street, be reconstructed with asphalt pavement and concrete curb & gutter to a width of 31’ from back of curb to back of curb, which is 2’ narrower than the existing street. Existing parking provisions within the project limits will remain unchanged. | approved | Pass |
Action details
|
Video
|
20-1234
| 1 | | | Report Action Item | Request for a Street Occupancy Permit to place construction equipment, jersey barriers and fencing in the 300 block E. College Avenue right-of-way and the 300 block E. Johnston Street right-of-way to facilitate construction of a multi-tenant retail/residential project be approved through October 1, 2021. | approved | Pass |
Action details
|
Not available
|
20-1246
| 1 | | | Report Action Item | Approve parking changes related to the Carpenter Street Reconstruction Project (Taft Avenue to Fremont Street). | approved | Pass |
Action details
|
Not available
|
20-1247
| 1 | | | Report Action Item | Approve parking changes related to the Prospect Avenue Reconstruction Project (Haskell Street to west City Limits). | approved | Pass |
Action details
|
Not available
|
20-1248
| 1 | | | Report Action Item | Approve renegotiated agreement with Outagamie County for Traffic-Related Services. | approved | Pass |
Action details
|
Not available
|
20-1249
| 1 | | | Report Action Item | Approve the installation of STOP signs on Spring Street at Summit Street (Follow-up to Six Month Trial Period). | approved | Pass |
Action details
|
Not available
|
20-1250
| 1 | | | Report Action Item | Class "B" Beer and "Class B" Liquor License Permanent Premise Amendment application for Skogen's Foodliner Inc, d/b/a Festival Foods, Paul Klinkhammer, Agent, located at 1200 W Northland Ave, contingent upon approval from all departments. | approved | Pass |
Action details
|
Not available
|
20-1255
| 1 | | | Report Action Item | Class "B" Beer and "Class C" Wine License application for Poppy Avenue Boutique & Clean Beauty Bar, Audra Balof, Agent, located at 161 S Riverheath Way Suite 2600 & Suite 2700. | approved | Pass |
Action details
|
Not available
|
20-1222
| 1 | | | Report Action Item | Request to approve the Intergovernmental Cooperation Agreement between the City of Appleton and the Town of Buchanan to create a revised common municipal boundary line between the municipalities and assign zoning classification to the properties identified for incorporation into the City of Appleton by adoption of the attached Resolution and subject to the stipulation in the attached staff report | approved | Pass |
Action details
|
Not available
|
20-1214
| 1 | | | Report Action Item | Request to approve Third Addition to Clearwater Creek Development Agreement | approved | Pass |
Action details
|
Not available
|
20-1223
| 1 | | | Report Action Item | Request to award the 2020 Wastewater Treatment Plant Asbestos Flooring Removal project to Cardinal Construction Co. Inc in the amount of $38,797 with a contingency of 10% for a project total not to exceed $42,677 | approved | Pass |
Action details
|
Not available
|
20-1224
| 1 | | | Report Action Item | Request to award the 2020 Fire Station #1 Bathroom Renovation project to Miron Construction Co. Inc in the amount of $182,257 with a contingency of 10% for a project total not to exceed $200, 483 and the following 2020 budget adjustment:
Facilities Management Capital Projects
2020 Fire Station #6 Hardscapes Project - $50,000
2020 Fire Station #1 Bathroom Renovation Project +$50,000
to transfer funds between projects to allow for the meeting of current ADA codes | approved | Pass |
Action details
|
Not available
|
20-1236
| 1 | | | Report Action Item | Request to approve Broadway Hills Estate (Phase 1) Development Agreement | approved | Pass |
Action details
|
Not available
|
20-1242
| 1 | | | Report Action Item | Request to award the 2020 Ionization HVAC project to Energy Control and Design, Inc for a sole-source contract not to exceed $125,000 | approved | Pass |
Action details
|
Not available
|
20-1211
| 1 | | | Report Action Item | Request to approve revisions to the City of Appleton Subordination Policy for the Homeowner Rehabilitation Loan Program as set forth in the attached document | approved | Pass |
Action details
|
Not available
|
20-1245
| 1 | | | Report Action Item | Approved updated Water Leak Policy | approved | Pass |
Action details
|
Not available
|