21-1665
| 1 | | | Minutes | Minutes from November 22, 2021 | approved | Pass |
Action details
|
Video
|
21-1578
| 1 | | | Report Action Item | Proposed changes to Municipal Code Section 9, Division 3-Central Business District Street Vendors. | recommended for approval | Pass |
Action details
|
Video
|
21-1696
| 1 | | | Report Action Item | Lawrence Street, from Appleton Street to Durkee Street, be reconstructed with concrete pavement and curb and gutter. The details of the proposed Lawrence Street reconstruction project are as follows:
Appleton St - Oneida St:
· New concrete pavement constructed to a width of 58’ from back of curb to back of curb, which is 22’ wider than the existing street within this portion of the project.
· 1 travel lane in each direction
· Dedicated left turn lane at Appleton Street for westbound traffic
· Dedicated bike lanes along both sides of the street
· Parallel on-street parking along both sides of the street
· Proposed streetscape elements per Downtown Streetscape Design Guide
· Raised intersection @ Oneida Street
Oneida St - Morrison St:
· New concrete pavement to be constructed to a width of 50’ from back of curb to back of curb, which is 9’ wider than the existing street within this portion of the project.
· 1 travel lane in each direction
· Dedicated bike lanes along both sides of the street
· Parallel on-street parking along both sides of the street
· Proposed | recommended for approval | Pass |
Action details
|
Video
|
21-1697
| 1 | | | Report Action Item | Oneida Street, from Lawrence Street to College Avenue, be reconstructed with concrete pavement and curb & gutter. The details of the proposed Lawrence Street reconstruction project are as follows:
· New concrete pavement to be constructed to a width of 38’ from back of curb to back of curb, which is 4’ narrower than the existing street within this portion of the project.
· 1 travel lane in each direction
· Parallel on-street parking along both sides of the street
· 2 marked mid-block crosswalks
· Proposed streetscape elements per Downtown Streetscape Design Guide | recommended for approval | Pass |
Action details
|
Video
|
21-1698
| 1 | | | Report Action Item | Morrison Street, from Lawrence Street to Washington Street, be reconstructed with concrete pavement and curb and gutter. The details of the proposed Morrison Street reconstruction project are as follows:
Lawrence St - College Ave:
· New concrete pavement constructed to a width of 38’ from back of curb to back of curb, which is 4’ narrower than the existing street within this portion of the project.
· 1 travel lane in each direction
· Shared bike lanes
· Parallel on-street parking along both sides of the street
· Proposed streetscape elements per Downtown Streetscape Design Guide
· 2 marked mid-block crosswalks
College Ave -Washington St:
· New concrete pavement constructed to a width of 38’ from back of curb to back of curb, which is 4’ narrower than the existing street within this portion of the project.
· 1 travel lane in each direction
· Shared bike lanes
· Parallel on-street parking along both sides of the street
· Proposed streetscape elements per Downtown Streetscape Design Guide
· 1 marked mid-block crosswalk | recommended for approval | Pass |
Action details
|
Video
|
21-1699
| 1 | | | Report Action Item | Durkee Street, from 200’ south of Lawrence Street to Washington Street, be reconstructed with concrete pavement and curb and gutter. The details of the proposed Durkee Street reconstruction project are as follows:
200’ south of Lawrence St - Lawrence St:
· New concrete pavement constructed to a width of 38’ from back of curb to back of curb, which is the same width as the existing street within this portion of the project.
· New concrete sidewalk extended to the south limits of the project along the east side of the street
· 1 travel lane in each direction
· Parallel on-street parking along both sides of the street
· Proposed streetscape elements per Downtown Streetscape Design Guide
· Cul-de-sac at south end of the block
Lawrence St - College Ave:
· New concrete pavement constructed to a width of 38’ from back of curb to back of curb, which is 5’ wider than the existing street within this portion of the project.
· 1 travel lane in each direction
· Shared bike lanes
· Parallel on-street parking along both sides of the street
· Proposed streetscape elements pe | recommended for approval | Pass |
Action details
|
Video
|
21-1666
| 1 | | | Report Action Item | Approve Department of Public Works 2022 Fee Schedules. | recommended for approval | Pass |
Action details
|
Video
|
21-1667
| 1 | | | Report Action Item | Approve proposed changes to Municipal Code Chapter 15 Solid Waste and Recycling to correspond with operational changes previously approved at Council. | recommended for approval | Pass |
Action details
|
Video
|
21-1668
| 1 | | | Report Action Item | Award 2022 Contract for Operation, Maintenance, Monitoring and Passive Vent Improvements at the Closed City of Appleton Landfill to SCS Engineers, in an amount not to exceed $218,393. | recommended for approval | Pass |
Action details
|
Video
|
21-1689
| 1 | | | Report Action Item | Request from AT&T for a permanent street occupancy permit to install a 5.5' x 5.5' x 3' utility cabinet in the Henry Street right-of-way near Buchanan Street. | recommended for approval | Pass |
Action details
|
Video
|
21-1691
| 1 | | | Report Action Item | Approve changes to City of Appleton Brush Collection Policy. | recommended for approval | Pass |
Action details
|
Video
|
21-1692
| 1 | | | Report Action Item | Approve changes to City of Appleton Annual Leaf Collection Policy. | recommended for approval | Pass |
Action details
|
Video
|
21-1693
| 1 | | | Report Action Item | Approve 2022 Sole Source Purchase Request for various traffic equipment and technologies. | recommended for approval | Pass |
Action details
|
Video
|
21-1690
| 1 | | | Report Action Item | Inspections Division Permit Summary Comparison Report for November, 2021. | | |
Action details
|
Video
|