19-0886
| 1 | | | Report Action Item | Minutes from June 10, 2019 | approved | Pass |
Action details
|
Video
|
19-0751
| 1 | | | Report Action Item | Approve increasing monthly parking permits from $30/month to $40/month as part of the 2020 Budget with a January 1, 2020 implementation date. | recommended for approval | Fail |
Action details
|
Video
|
19-0895
| 1 | | | Report Action Item | Anticipated award for Unit Q-19, Pavement Marking contract (paint). | recommended for approval | Pass |
Action details
|
Video
|
19-0890
| 1 | | | Report Action Item | Madison Street, from Taft Avenue to Calumet Street, be reconstructed with asphalt pavement and concrete curb & gutter to a width of 33’ from back of curb to back of curb, which is the same width as the existing street. Existing parking provisions within the project limits will remain unchanged. | recommended for approval | Pass |
Action details
|
Video
|
19-0889
| 1 | | | Report Action Item | Douglas Street, from Reid Drive to Prospect Avenue, be reconstructed with asphalt pavement and concrete curb & gutter to a width of 32’ from back of curb to back of curb, which is 1’ narrower than the existing street. The proposed 1’ narrowing will occur along the west curb line. Existing parking provisions within the project limits will remain unchanged. | recommended for approval | Pass |
Action details
|
Video
|
19-0888
| 1 | | | Report Action Item | R-B-Summer Street, from Gillet Street to Richmond Street, be reconstructed with asphalt and concrete pavement and curb and gutter. The dimensions of the Summer Street reconstruction project are as follows:
Gillet Street-295' west of Mason Street: New asphalt pavement and concrete curb 7 gutter to be constructed to a width of 31' from back of curb to back of curb, which is 2' narrower that the existing street within this portion of the project.
285' west of Mason Street- Mason Street: New concrete pavement to be constructed to a width of 33' rom back of curb to back of curb, which is the same width as the existing street within this portion of the project.
Mason Street- 100' west of Richmond Street: New asphalt pavement and concrete curb & gutter to be constructed to a width of 31' from back of curb to back of curb, which is 2' narrower than the existing street within this portion of the project.
100' west of Richmond Street- Richmond Street: New as[halt pavement and concrete curb & gutter to be constructed to a width of 33' fro back of curn to back of curb, which is the same | recommended for approval | Pass |
Action details
|
Video
|
19-0887
| 1 | | | Report Action Item | Approve proposed changes to Article VI (Electrical) of the Municipal Code. | recommended for approval | Pass |
Action details
|
Video
|
19-0891
| 1 | | | Report Action Item | Approve proposed changes to Article V (Plumbing) and Article VII (Mechanical) of the Municipal Code related to reinspection fees. | recommended for approval | Pass |
Action details
|
Video
|
19-0892
| 1 | | | Report Action Item | Approve Street Name Sign Distribution Policy. | recommended for approval | Pass |
Action details
|
Video
|
19-0893
| 1 | | | Report Action Item | Request from Path to Freedom, LLC to waive the $160 Weed Administration fee for 214 E. Winnebago St. | recommended for denial | Pass |
Action details
|
Video
|
19-0894
| 1 | | | Report Action Item | Request from Fika Tea Bar for a Street Occupancy Permit to place tables and chairs in the College Avenue Beautification strip at 207 W. College Avenue. | recommended for approval | Pass |
Action details
|
Video
|
19-0753
| 1 | | | Report Action Item | Downtown parking concerns based on recent Appleton Downtown Inc. survey. | | |
Action details
|
Video
|
19-0896
| 1 | | | Report Action Item | Discuss concept of converting 30-minute red head meters to 25-minute meters. | | |
Action details
|
Video
|
19-0897
| 1 | | | Report Action Item | Employee Retention update for the Department of Public Works. | | |
Action details
|
Video
|