20-1648
| 1 | | | Report Action Item | Minutes from December 7, 2020. | approved | Pass |
Action details
|
Video
|
20-1649
| 1 | | | Report Action Item | Design Hearing for the following street in the 2022 pavement reconstruction program:
Appleton Street (College Avenue to Atlantic Street) | | |
Action details
|
Video
|
20-1569
| 1 | | | Report Action Item | Owaissa Street, from Opechee Street to Pacific Street, be reconstructed with concrete pavement and curb & gutter to a width of 24’ 20'from back of curb to back of curb, which is approximately 1’-4’ wider than the existing street. New concrete sidewalk to be constructed along the east side of Owaissa Street from approximately 160’ south of Pacific Street to approximately 500’ south of Pacific Street. Existing parking provisions within the project limits will remain unchanged. Parking be prohibited on both sides of the street. | held | Pass |
Action details
|
Video
|
20-1650
| 1 | | | Report Action Item | Approve 2021 Sole Source Purchase Request for various traffic equipment and technologies. | recommended for approval | Pass |
Action details
|
Video
|
20-1651
| 1 | | | Report Action Item | Request from Tilson Technology Management for a permanent street occupancy permit to install a 5.5' X 3' X 5' utility cabinet for the TDS 5G Project at the Northland Avenue/Mason Street intersection. This location is number 6 of 13 total nodes. | recommended for approval | Pass |
Action details
|
Not available
|
20-1652
| 1 | | | Report Action Item | Request from Tilson Technology Management for a permanent street occupancy permit to install a 5.5' X 3' X 5' utility cabinet for the TDS 5G Project at the Northland Avenue /McDonald Street intersection. This location is number 7 of 13 nodes. | recommended for approval | Pass |
Action details
|
Video
|
20-1653
| 1 | | | Report Action Item | Project Update for I-41 from State Hwy 15 to County HWY J. | | |
Action details
|
Video
|
20-1654
| 1 | | | Report Action Item | Annual Crash Overview 2019. | | |
Action details
|
Video
|