File #: 22-1006    Version: 1 Name:
Type: Report Action Item Status: Reported from Committee
File created: 8/3/2022 In control: Utilities Committee
On agenda: 8/9/2022 Final action: 8/17/2022
Title: Award Engineering Contract to McMahon Associates for the Water Treatment Facility Optimized Corrosion Control Treatment (OCCT) Phosphoric Acid System Design in the amount of $35,200 with a contingency of $5,280.
Attachments: 1. OCCT Project 08-01-22.pdf

Title

Award Engineering Contract to McMahon Associates for the Water Treatment Facility Optimized Corrosion Control Treatment (OCCT) Phosphoric Acid System Design in the amount of $35,200 with a contingency of $5,280.