Title:
|
Valley Road, from 250’ west of Chain Drive to 165’ east of Forestview Court, be reconstructed with concrete pavement and concrete curb & gutter to a width of 48’ from back of curb to back of curb., which is 23’ wider than the existing street.
Valley Road is proposed to be reconstructed with 1 travel lane in each direction, a two-way left turn lane, bike lanes along both sides of the street, and new 5’ sidewalk along both sides of street, within the project limits.
On street parking would be restricted (prohibited) along Valley Road.
|