File #: 18-1463    Version: 1 Name:
Type: Report Action Item Status: Passed
File created: 10/5/2018 In control: Municipal Services Committee
On agenda: 10/8/2018 Final action: 10/17/2018
Title: Opechee Street, from Pacific Street to Leminwah Street, be reconstructed with concrete pavement. The dimensions of the Opechee Street reconstruction project are as follows: Pacific St - 125’ east of Pacific St: New concrete pavement to be constructed to a width of 20’, which is the same width as the existing street within this portion of the project. 100’ west of Leminwah St - Leminwah St: New concrete pavement to be constructed to match the existing widths and configuration. Existing trail between the 2 segments of Opechee Street to be reconstructed with asphalt pavement to a width of 8 to 10’, based on available space. Existing parking provisions within the project limits will remain unchanged.

Title

Opechee Street, from Pacific Street to Leminwah Street, be reconstructed with concrete pavement.  The dimensions of the Opechee Street reconstruction project are as follows:

Pacific St - 125’ east of Pacific St:  New concrete pavement to be constructed to a width of 20’, which is the same width as the existing street within this portion of the project. 

100’ west of Leminwah St - Leminwah St:  New concrete pavement to be constructed to match the existing widths and configuration.

Existing trail between the 2 segments of Opechee Street to be reconstructed with asphalt pavement to a width of 8 to 10’, based on available space.

Existing parking provisions within the project limits will remain unchanged.