Title:
|
Opechee Street, from Pacific Street to Leminwah Street, be reconstructed with concrete pavement. The dimensions of the Opechee Street reconstruction project are as follows:
Pacific St - 125’ east of Pacific St: New concrete pavement to be constructed to a width of 20’, which is the same width as the existing street within this portion of the project.
100’ west of Leminwah St - Leminwah St: New concrete pavement to be constructed to match the existing widths and configuration.
Existing trail between the 2 segments of Opechee Street to be reconstructed with asphalt pavement to a width of 8 to 10’, based on available space.
Existing parking provisions within the project limits will remain unchanged.
|