File #: 18-1462    Version: 1 Name:
Type: Report Action Item Status: Passed
File created: 10/5/2018 In control: Municipal Services Committee
On agenda: 10/8/2018 Final action: 10/17/2018
Title: Morrison Street, from Hancock Street to Wisconsin Avenue, be reconstructed with asphalt pavement and concrete curb & gutter. The dimensions of the Morrison Street reconstruction project are as follows: Hancock St - Summer St: New asphalt pavement to be constructed to a width of 28’ from back of curb to back of curb, which is the same width as the existing street within this portion of the project. Summer St - Wisconsin Ave: New asphalt pavement to be constructed to a width of 37’ from back of curb to back of curb, which is the same width as the existing street within this portion of the project. Existing parking provisions within the project limits will remain unchanged.

Title

Morrison Street, from Hancock Street to Wisconsin Avenue, be reconstructed with asphalt pavement and concrete curb & gutter.  The dimensions of the Morrison Street reconstruction project are as follows:

Hancock St - Summer St:  New asphalt pavement to be constructed to a width of 28’ from back of curb to back of curb, which is the same width as the existing street within this portion of the project. 

Summer St - Wisconsin Ave:  New asphalt pavement to be constructed to a width of 37’ from back of curb to back of curb, which is the same width as the existing street within this portion of the project.

Existing parking provisions within the project limits will remain unchanged.