File #: 17-1843    Version: 1 Name:
Type: Report Action Item Status: Passed
File created: 11/10/2017 In control: Municipal Services Committee
On agenda: 11/20/2017 Final action: 12/6/2017
Title: Evergreen Drive, from Alvin Street to Haymeadow Avenue, be reconstructed with concrete pavement and curb and gutter to a width of 38' from back of curb to back of curb. In addition: a, Bike lanes to be incorporated as part of the project. b. New 5' wide concrete sidewalk to be constructed 3' north of the south right-of-way of Evergreen Drive. c. New 10' wide concrete sidewalk/trail to be constructed 4' south of the north right-of-way of Evergreen Drive.
Attachments: 1. Evergreen Drive Questions and Responses.pdf

Title

Evergreen Drive, from Alvin Street to Haymeadow Avenue, be reconstructed with concrete pavement and curb and gutter to a width of 38' from back of curb to back of curb.  In addition:

a,  Bike lanes to be incorporated as part of the project.

b.  New 5' wide concrete sidewalk to be constructed 3' north of the south right-of-way of Evergreen Drive.

c.  New 10' wide concrete sidewalk/trail to be constructed 4' south of the north right-of-way of Evergreen Drive.