File #: 17-1842    Version: 1 Name:
Type: Report Action Item Status: Passed
File created: 11/10/2017 In control: Municipal Services Committee
On agenda: 11/20/2017 Final action: 12/6/2017
Title: Alvin Street, from Evergreen Drive to cul-de-sac, be reconstructed with concrete pavement and curb and gutter to a width of 33' from back of curb to back of curb. New 5' sidewalk to be constructed along entire length of project.
Attachments: 1. Alvin Street from Evergreen Dr to cul-de-sac.pdf

Title

Alvin Street, from Evergreen Drive to cul-de-sac, be reconstructed with concrete pavement and curb and gutter to a width of 33' from back of curb to back of curb.  New 5' sidewalk to be constructed along entire length of project.