File #: 17-1100    Version: 1 Name:
Type: Report Action Item Status: Passed
File created: 7/17/2017 In control: Municipal Services Committee
On agenda: 7/24/2017 Final action: 8/2/2017
Title: Center Street from North Street to Atlantic Street, be reconstructed with asphalt pavement and concrete curb & gutter to a width of 31', which is 2' narrower than the existing street. Existing parking proposed to remain unchanged.

Title

Center Street from North Street to Atlantic Street, be reconstructed with asphalt pavement and concrete curb & gutter to a width of 31', which is 2' narrower than the existing street.  Existing parking proposed to remain unchanged.