File #: 16-1420    Version: 1 Name:
Type: Report Action Item Status: Passed
File created: 9/8/2016 In control: Municipal Services Committee
On agenda: 9/13/2016 Final action: 9/21/2016
Title: Kamps Avenue, from Fire Station #5 to Douglas Street, be reconstructed with concrete pavement to a width of 29’ from back of curb to back of curb, which is 4’ wider than the existing street. New concrete sidewalk would be constructed along the south side of Kamps Avenue within the project limits. Parking would be prohibited along the south side of Kamps Avenue within the project limits.

Title

Kamps Avenue, from Fire Station #5 to Douglas Street, be reconstructed with concrete pavement to a width of 29’ from back of curb to back of curb, which is 4’ wider than the existing street.  New concrete sidewalk would be constructed along the south side of Kamps Avenue within the project limits.  Parking would be prohibited along the south side of Kamps Avenue within the project limits.