Title:
|
Summer Street, from Morrison Street to Drew Street, be reconstructed with asphalt pavement and concrete curb & gutter to a width of 35’ from back of curb to back of curb, which is 2’ narrower than the existing street. Summer Street, from Drew Street to Union Street, be reconstructed with asphalt pavement and concrete curb & gutter to a width of 33’ from back of curb to back of curb, which is 4’ narrower than the existing street. Existing parking provisions within the project limits will remain unchanged.
|