Title: Approve design for Orange Street portion of the 2018 S. Oneida Street Concrete Reconstruction Project as follows: Orange Street from Olde Oneida Street to 200' south: reconstruct the roadway with concrete pavement to a width of 36' from back of curb to back of curb. This is approximately 7' wider than existing. All widening to be done to the west. Construct a 6' wide sidewalk along the east side of the street tight to the back of curb. Allow parking on both sides of the street.
Attachments: 1. Appr. design for Olde Oneida St & Orange St.pdf

Title

Approve design for Orange Street portion of the 2018 S. Oneida Street Concrete Reconstruction Project as follows:

 

Orange Street from Olde Oneida Street to 200' south:  reconstruct the roadway with concrete pavement to a width of 36' from back of curb to back of curb.  This is approximately 7' wider than existing.  All widening to be done to the west.  Construct a 6' wide sidewalk along the east side of the street tight to the back of curb.  Allow parking on both sides of the street.