File #: 15-2021    Version: 1 Name:
Type: Report Action Item Status: Passed
File created: 12/3/2015 In control: Municipal Services Committee
On agenda: 12/8/2015 Final action: 12/16/2015
Title: Approve design for Olde Oneida Street portion of the 2018 S. Oneida Street Concrete Reconstruction Project as follows: Olde Oneida Street from Oneida Street to E. South River Street: reconstruct the roadway with concrete pavement to accommodate one thru lane in each direction, bike lanes in each direction and a right turn lane on to Oneida Street. Construct a 6' wide sidewalk tight to the back of curb on both sides. Construct indented parking along the south side of Olde Oneida Street between Orange Street and Lincoln Street. All other on-street parking would be removed from Olde Oneida Street.
Attachments: 1. Appr. design for Olde Oneida St & Orange St.pdf

Title

Approve design for Olde Oneida Street portion of the 2018 S. Oneida Street Concrete Reconstruction Project as follows:

 

Olde Oneida Street from Oneida Street to E. South River Street:  reconstruct the roadway with concrete pavement to accommodate one thru lane in each direction, bike lanes in each direction and a right turn lane on to Oneida Street.  Construct a 6' wide sidewalk tight to the back of curb on both sides.  Construct indented parking along the south side of Olde Oneida Street between Orange Street and Lincoln Street.  All other on-street parking would be removed from Olde Oneida Street.