File #: 15-1149    Version: 1 Name:
Type: Report Action Item Status: Passed
File created: 7/1/2015 In control: Municipal Services Committee
On agenda: 7/7/2015 Final action: 7/15/2015
Title: Alley north of Spencer Street (Spruce St to Summit St): The alley north of Spencer Street, from Spruce Street to Summit Street, be reconstructed with concrete pavement to a width of 10’ from edge of pavement to edge of pavement, which is the same width as the existing alley.

Title

Alley north of Spencer Street (Spruce St to Summit St): 

The alley north of Spencer Street, from Spruce Street to Summit Street, be reconstructed with concrete pavement to a width of 10’ from edge of pavement to edge of pavement, which is the same width as the existing alley.