File #: 15-761    Version: 1 Name:
Type: Report Action Item Status: Passed
File created: 5/7/2015 In control: Municipal Services Committee
On agenda: 5/12/2015 Final action: 5/20/2015
Title: Herbert Street: Herbert Street, from Pine Street to Rogers Street, be reconstructed with asphalt pavement and concrete curb and gutter to a width of 33' from back of curb to back of curb, which is the same width as the existing street.  New sidewalk would be constructed to the Right-of-Way line along the west side of Douglas from Pine Street to Rogers Avenue.  Current on-street parking would remain unchanged.
Title
Herbert Street:
Herbert Street, from Pine Street to Rogers Street, be reconstructed with asphalt pavement and concrete curb and gutter to a width of 33' from back of curb to back of curb, which is the same width as the existing street.  New sidewalk would be constructed to the Right-of-Way line along the west side of Douglas from Pine Street to Rogers Avenue.  Current on-street parking would remain unchanged.