File #: 15-756    Version: 1 Name:
Type: Report Action Item Status: Passed
File created: 5/7/2015 In control: Municipal Services Committee
On agenda: 5/26/2015 Final action: 6/3/2015
Title: Douglas Street: Douglas Street, from Pine Street to Haskell Street, be reconstructed with asphalt pavement and concrete curb and gutter to a width of 33' from back of curb to back of curb, which is the same width as the existing street. New sidewalk would be constructed to the Right-of-Way line along the west side of Douglas from Pine Street to Haskell Street. New sidewalk would be constructed to the Right-of-Way line along the east side of Douglas from Pine Street to Rogers Avenue. Current on-street parking would remain unchanged.
Attachments: 1. Douglas Street.pdf
Title
Douglas Street:  
Douglas Street, from Pine Street to Haskell Street, be reconstructed with asphalt pavement and concrete curb and gutter to a width of 33' from back of curb to back of curb, which is the same width as the existing street.  New sidewalk would be constructed to the Right-of-Way line along the west side of Douglas from Pine Street to Haskell Street.  New sidewalk would be constructed to the Right-of-Way line along the east side of Douglas from Pine Street to Rogers Avenue.   Current on-street parking would remain unchanged.