Title:
|
Durkee Street, from Atlantic Street to Summer Street, be reconstructed with asphalt pavement and concrete curb and gutter to a width of 31’ from back of curb to back of curb, which is 2’ narrower than the existing street. Existing on-street parking provisions within the project limits will remain unchanged.
|