File #: 14-1322    Version: 1 Name:
Type: Report Action Item Status: Passed
File created: 7/28/2014 In control: Utilities Committee
On agenda: 8/12/2014 Final action: 8/20/2014
Title: Recommendation to contract with Lappen Security and Faith Technologies in the amount of $73,828 with a 10% contingency of $7,383 for a total of $81,211 in CIP funding to run new Cat 6 cabling in both the Waste Treatment and Water Treatment Plants along with installing new security cameras in each location. The cameras consist of 8 cameras for the Water Treatment Plant with cabling and 6 at the Waste Treatment Plant rated for those types of environments.
Attachments: 1. Utilities Camera Security System (2).pdf
Title
Recommendation to contract with Lappen Security and Faith Technologies in the amount of $73,828 with a 10% contingency of $7,383 for a total of $81,211 in CIP funding to run new Cat 6 cabling in both the Waste Treatment and Water Treatment Plants along with installing new security cameras in each location. The cameras consist of 8 cameras for the Water Treatment Plant with cabling and 6 at the Waste Treatment Plant rated for those types of environments.