Title: Verbrick Street, from Bouten Street to Willkie Street, be reconstructed as follows: -Verbrick Street, from Bouten Street to Sanders Street, be reconstructed with asphalt pavement and concrete curb and gutter to a width of 31’ from back of curb to back of curb, which is 2’ narrower than the existing street. -Verbrick Street, from Sanders Street to Peabody Street, be reconstructed with asphalt pavement and concrete curb and gutter to a width of 33’ from back of curb to back of curb, which is the same width as the existing street. New sidewalk would be constructed to the Right-of-Way line along the north side of the portion of Verbrick Street between the south and north leg of Peabody Street. -Verbrick Street, from Peabody Street to Willkie Street, be reconstructed with asphalt pavement and concrete curb and gutter to a width of 31’ from back of curb to back of curb, which is 2’ narrower than the existing street.
Title
 
Verbrick Street, from Bouten Street to Willkie Street, be reconstructed as follows:
-Verbrick Street, from Bouten Street to Sanders Street, be reconstructed with asphalt pavement and concrete curb and gutter to a width of 31' from back of curb to back of curb, which is 2' narrower than the existing street.
-Verbrick Street, from Sanders Street to Peabody Street, be reconstructed with asphalt pavement and concrete curb and gutter to a width of 33' from back of curb to back of curb, which is the same width as the existing street.  New sidewalk would be constructed to the Right-of-Way line along the north side of the portion of Verbrick Street between the south and north leg of Peabody Street.