Title:
|
Opechee Street, from Leminwah Street to Owaissa Street, be reconstructed with concrete pavement and curb & gutter to a width of 20’ from back of curb to back of curb, which is approximately 1-3’ wider than the existing street. Existing parking provisions within the project limits will remain unchanged.
|