File #: 16-1417    Version: 1 Name:
Type: Report Action Item Status: Passed
File created: 9/8/2016 In control: Municipal Services Committee
On agenda: 9/27/2016 Final action: 10/19/2016
Title: * CRITICAL TIMING* Catherine Street, from Washington Street to North Street, be reconstructed with asphalt pavement and concrete curb & gutter to a width of 31’ from back of curb to back of curb, which is 2’ narrower than the existing street. New concrete sidewalk would be constructed along the east side of Catherine Street from Franklin Street to Eldorado Street. Existing parking provisions within the project limits will remain unchanged.

Title

* CRITICAL TIMING* Catherine Street, from Washington Street to North Street, be reconstructed with asphalt pavement and concrete curb & gutter to a width of 31’ from back of curb to back of curb, which is 2’ narrower than the existing street.  New concrete sidewalk would be constructed along the east side of Catherine Street from Franklin Street to Eldorado Street.  Existing parking provisions within the project limits will remain unchanged.