File #: 20-1569    Version: 1 Name:
Type: Report Action Item Status: Passed
File created: 12/2/2020 In control: Municipal Services Committee
On agenda: 12/7/2020 Final action: 1/20/2021
Title: Owaissa Street, from Opechee Street to Pacific Street, be reconstructed with concrete pavement and curb & gutter to a width of 24’ 20'from back of curb to back of curb, which is approximately 1’-4’ wider than the existing street. New concrete sidewalk to be constructed along the east side of Owaissa Street from approximately 160’ south of Pacific Street to approximately 500’ south of Pacific Street. Existing parking provisions within the project limits will remain unchanged. Parking be prohibited on both sides of the street.
Attachments: 1. Comments-Owaissa Street.pdf, 2. Comments -Owaissa St Project.pdf, 3. Owaissa St Design Approval Process.pdf, 4. Email-Owaissa St.pdf

Title

Owaissa Street, from Opechee Street to Pacific Street, be reconstructed with concrete pavement and curb & gutter to a width of 24’ 20'from back of curb to back of curb, which is approximately 1’-4’ wider than the existing streetNew concrete sidewalk to be constructed along the east side of Owaissa Street from approximately 160’ south of Pacific Street to approximately 500’ south of Pacific Street.  Existing parking provisions within the project limits will remain unchanged.  Parking be prohibited on both sides of the street.