File #: 13-1117    Version: 1 Name:
Type: Report Action Item Status: Passed
File created: 8/8/2013 In control: Municipal Services Committee
On agenda: 8/13/2013 Final action: 8/21/2013
Title: Badger Avenue from Mason Street to Wisconsin Avenue be reconstructed with concrete pavement and curb and gutter to a width of 47' from back of curb to back of curb, which is 2' narrower than the existing street width. The newly reconstructed Badger Avenue would include an 8' parking lane along the north/east side of the street, a 2' buffer area between the parking lane and bike lane, a 5' wide bike lane along the north/east side of the street, two 12.5' travel lanes, and a 6' wide bike lane along the south/west side of the street. Parking would be removed from the south/west side of Badger Avenue within the proposed project limits. New concrete sidewalk would be constructed to the right-of-way line along the property at 1219 Badger Avenue.
Title
Badger Avenue from Mason Street to Wisconsin Avenue be reconstructed with concrete pavement and curb and gutter to a width of 47' from back of curb to back of curb, which is 2' narrower than the existing street width.  The newly reconstructed Badger Avenue would include an 8' parking lane along the north/east side of the street, a 2' buffer area between the parking lane and bike lane, a 5' wide bike lane along the north/east side of the street, two 12.5' travel lanes, and a 6' wide bike lane along the south/west side of the street.  Parking would be removed from the south/west side of Badger Avenue within the proposed project limits.  New concrete sidewalk would be constructed to the right-of-way line along the property at 1219 Badger Avenue.