File #: 22-1292    Version: 1 Name:
Type: Report Action Item Status: Passed
File created: 10/6/2022 In control: Municipal Services Committee
On agenda: 10/10/2022 Final action: 10/19/2022
Title: Summit Street, from Packard Street to Elsie Street, be reconstructed with asphalt pavement and concrete curb & gutter to a width of 26’ from back of curb to back of curb, which is 2’ narrower than the existing street. Existing on-street parking would be restricted along the west side of Summit Street, within the project limits.

Title

Summit Street, from Packard Street to Elsie Street, be reconstructed with asphalt pavement and concrete curb & gutter to a width of 26’ from back of curb to back of curb, which is 2’ narrower than the existing street.  Existing on-street parking would be restricted along the west side of Summit Street, within the project limits.