File #: 14-1110    Version: 1 Name:
Type: Report Action Item Status: Passed
File created: 6/19/2014 In control: Municipal Services Committee
On agenda: 6/24/2014 Final action: 7/2/2014
Title: Douglas Street, from College Avenue to Packard Street, be reconstructed with asphalt pavement and concrete curb and gutter to a width of 37' from back of curb to back of curb, which is the same width as the existing street.
Title
Douglas Street, from College Avenue to Packard Street, be reconstructed with asphalt pavement and concrete curb and gutter to a width of 37' from back of curb to back of curb, which is the same width as the existing street.