Title:
|
Summit Street, from Prospect Avenue to Fourth Street, be reconstructed with asphalt pavement and concrete curb & gutter to a width of 26’ from back of curb to back of curb, which is 2’ narrower than the existing street. On-street parking would be removed within the project limits along the west side of Summit Street.
|