Title: Summit Street, from Prospect Avenue to Fourth Street, be reconstructed with asphalt pavement and concrete curb & gutter to a width of 26’ from back of curb to back of curb, which is 2’ narrower than the existing street. On-street parking would be removed within the project limits along the west side of Summit Street.
Attachments: 1. Summit St.-watermain breaks map & pic.pdf, 2. Summit St-project proposal.pdf

Title

Summit Street, from Prospect Avenue to Fourth Street, be reconstructed with asphalt pavement and concrete curb & gutter to a width of 26’ from back of curb to back of curb, which is 2’ narrower than the existing street.  On-street parking would be removed within the project limits along the west side of Summit Street.